My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2004-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:30:02 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2005
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2004-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Primary Piping System Installation <br /> the cyclic rating. The test pressure should not exceed Ilk 7. While the pipe is being checked for leaks,do not <br /> times the maximum rated operating pressure for the low stand at the end of the piping system or where it <br /> est rated element In the system. Pressure is then kept on changes directions. CAUTION: Failure to strictly <br /> the system for 1-8 hours while the line is inspected for leaks. follow these instructions can result in serious person- <br /> al injury,death,and/or property damage. <br /> C.Air Test Procedures and Safety Precautions(l) <br /> TESTING WITH AIR OR GAS IS EXTREMELY DAN- 8. Smith Fibercast recommends that after the piping has <br /> ■ GEROUS AND SHOULD NOT BE DONE. CONSULT passed the 50 psig(0.345 MPa)pressure test,the con- <br /> YOUR SMITH FIBERCAST REPRESENTATIVE OR tractor should reduce the product line pressure to a pres- <br /> CALL SMITH FIBERCAST AT 501-618-2243 IF YOU sure of not more than 25 psig(0.172 MPa)and maintain <br /> CONTEMPLATE EXCEEDING THE RECOMMENDED this pressure until all paving has been completed. Leave <br /> PRESSURES FOR THE LOWEST RATED ELEMENT OF pressure gauge on each line for inspection. The contrac- <br /> THE SYSTEM,OR IF YOU CONTEMPLATE USING AIR OR for should check the gauge daily to verify that the pipe is <br /> GAS IN SPITE OF THIS WARNING. REVIEW ALL SAFETY holding pressure. <br /> PRECAUTIONS BEFORE STARTING THE TEST. <br /> If testing with air or gas is required or requested to be per- If a leak is encountered during the test procedure,imme- <br /> formed,the following testing procedures and precautions diately release all pressure in the piping system and refer <br /> must be followed. to pages 15-16 for proper repair procedures. Upon corn- <br /> As in any system where pressure is employed,adequate pleting any necessary repairs to the piping system,follow <br /> safety precautions must be exercised. EXERCISE DUE the proper testing sequence and verify the system's in- <br /> CARE IN INSTALLING AND TESTING THE PIPING SYS- tegrity. <br /> TEM. DO NOT ASSUME THE RISK OF INJURY OR PROP- <br /> ERTY DAMAGE. <br /> 1. Visually inspect all bonded joints for proper insertion and <br /> adhesive cure prior to pressurizing the piping system. A <br /> gap between the adhesive bead and the fitting shoulder <br /> indicates that the possibility of joint failure exists. Make <br /> any necessary repairs before pressurizing the piping sys- <br /> tem. See Page 13 for potential causes of joint failure. <br /> 2. Check the integrity of the joints by pressurizing the system <br /> to 25 psig(0.172 MPa)and holding the pressure for a <br /> minimum of one minute,then soap all joints to test for <br /> leaks. <br /> 3. If there are no leaks,raise the line pressure in the system <br /> to a maximum of 50 psig(0.345 MPa). Again hold the <br /> pressure for at least one minute,and soap all joints to <br /> check for leaks. <br /> ■MA4. As serious personal injury or death can result,the <br /> X pipe inspector should take precautions for his/her <br /> personal safety and protection against flying debris, <br /> and also against the whipping action of the pipe, <br /> which can result from the sudden release of stored ener- <br /> gy. Goggles should be worn to protect against flying <br /> debris. <br /> 5. Avoid personal contact with the piping system while <br /> it is pressurized during testing,except for the actual <br /> ■ checking of the joints for leaks. Absolutely no one <br /> should be in the trench while the pipe is being ini- <br /> tially pressurized for leak testing. Notify all site personnel <br /> before beginning the testing procedure. <br /> 6. Do not straddle the pipe during testing or while <br /> checking the piping system for possible leaks. <br /> (1)Do not use these testing procedures and safety precautions for Smith <br /> Fibercast secondary containment piping systems. See page 25 of this manual <br /> for testing procedures for secondary containment piping systems. <br /> RED THREAD IIA Pipe & Fittings 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.