My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2004-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:30:02 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2005
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2004-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Primary Piping System Installation <br /> After the final nipple length is determined,cut the other <br /> end of the nipple and taper it,making sure that the nipple <br /> is on the tapering tool in exactly the same position as the <br /> first taper,which was used to measure the insertion <br /> length. <br /> d. If solvent is used to clean bonding surfaces,allow the <br /> cleaner to evaporate. Then apply adhesive to all bonding <br /> surfaces and insert the nipple into the line by lifting the <br /> line or moving it to one side. Pushing the pipe back into <br /> the line will push the nipple into the bell-Make certain that <br /> all tapers are tightly locked. <br /> C. Leaking Joints <br /> Any adhesive-bonded joints that leak during pressure test- <br /> ing MUST BE REMOVED AND REPLACED. Follow the pre- <br /> vious procedures using two sleeve couplings and pipe nipple_ <br /> Uponcompleting any necessary repairs to the piping sys- <br /> tem,follow the proper testing sequence to verify the system's <br /> integrity. <br /> RED THREAD IIA Pipe & Fittings al. 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.