My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2004-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:30:02 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2005
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2004-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Secondary Containment System Installation <br /> PI <br /> Blade E} <br /> Set lineGaug . <br /> e The containment pipe must be positioned over the <br /> product pipe before bonding the product pipe. Pre- <br /> Cutting Head installation of the sec- <br /> cutt;ng ondary containment pipe <br /> Bearing Plate e o 0 0 (only) is best accom- <br /> Allen screw ase plished at the same time <br /> the product pipe is dry-fit- <br /> ted together. This will La out m <br /> speed up installation and with all ryjaints <br /> Blade Holder prevent unnecessary de- <br /> Cutting Blade lays. Containrnent Product Pipe <br /> Typically, the length of Pipe — e--- <br /> Scarf®.D.of pipe so that the containment pipe X <br /> the Gam shell fitting halves should be 4"shorter than <br /> fit together when assem- { the primary pipe L <br /> L <br /> bled by hand. _ <br /> i --i---- <br /> OA <br /> If there is a gap between the <br /> dam shelf fittlng halves when , When installing termination fittings, use Table 10 to <br /> assembled by hand,pipe +^ determine the difference in primary and containment pipe <br /> must be surfed more. lengths(X). <br /> TABLE 10. Determining th of <br /> of a special scarfing blade(approx.4"1100 mm long),scarfing Containment Pipe <br /> blade holder, 1/8"alien wrench,and 3"and 4"(75 mm and X <br /> 100 mm)scarfing gauges,which are required to set the tool Product Containment Termination <br /> tolerances. The scarfing adapter kit is easily adapted to Smith Pipe Size Pipe Size Fitting <br /> Fibercast 2"-6"(50 mm-150 mm)manual tapering tool kit. <br /> Assemble the proper size mandrel and scarfing blade (in.) ( m) (in.) (mm) (in.) (mm) <br /> holder following the procedures in Bulletin No. F6600, <br /> Installation Instructions for 1"-6"Tapering Tool. 2 50 3 75 4'/Q 121 <br /> Rotate the tool body so that the scarfing blade holder is at 3 75 4 100 43/4 121 <br /> a 12 o'clock position;this assures that the blade will rest on 4 100 6 150 6 150 <br /> top of the gauge. Slide the proper size gauge all the way to <br /> the back of the mandrel. Insert the special blade into the <br /> blade holder all the way to the back of the tool body. After <br /> positioning the black reference mark on the gauge under the Where possible,temporarily place clam shell containment <br /> blade,be sure that the blade makes uniform contact with the fitting halves around the product fittings. This measure will <br /> gauge and that the blade holder is resting on the blade. help prevent foreign material from entering the containment <br /> Using the nuts,bolts,and washers supplied,tighten the pipe. <br /> blade holder to secure the blade. Now insert and slide the The containment fittings should be installed and the con- <br /> bearing plate into the slot located between the tool body and tainment system tested after the product piping system has <br /> the blade holder. The bearing plate will rest loosely on the been tested. NOTE: Do not leave rocks,pea gravel,sand, <br /> blade holder until it is locked into place using the supplied or other debris in the containment piping system. <br /> alien screws. The two alien screws should now be positioned <br /> so that each makes LiGHT contact with the bearing plate. ANI : Since every insertion of the primary piping <br /> NOTE: The alien screws only prevent the blade holder frommay vary,dry fit all secondary containment connec- <br /> ning during use. ■ tions to make sure that the insertion is approximately <br /> opeThe tool is now prepared to remove("scarf")the resin 3". Be sure that the containment pipe is not inserted <br /> gloss from the ends of the containment pipe. After removing too far into the containment fitting. The glossy O.D.of the <br /> the gauge,insert the tool into the pipe to be scarfed until the pipe should not be seated in the containment fitting. <br /> point of the blade just touches the end of the pipe. NOTE: <br /> The tool must be rotated in the same direction the wide side <br /> of the blade faces. Advance the tool in approximately 1/4"(6 <br /> mm)increments after each revolution. Continue the opera- <br /> tion until the resin gloss has been removed for a minimum <br /> length of 3"(75 mm). <br /> RED THREAD IIA Pipe & Fittings — 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.