My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2004-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:30:02 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2005
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2004-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment System Installation <br /> fiNfa, Cid` A11p 5 containment open systems with air to the equivalent static <br /> FFR SiECONOARl'CONTAli lrXT pI1 N head test pressure listed in Table 1.The pressure should be <br /> telt on the system for a minimum of one hour. The test pres- <br /> Secondary containment piping,3"and 4"(75 mm and 100 sure should not exceed the pressure rating of any component <br /> mm)diameter sizes,can be pressure tested by installing an in the piping system. It is the responsibility of the installer or <br /> in-line tee with a pressure gauge and a nipple in the 3/4" customer to temporarily seal the system for testing. <br /> threaded outlet of a termination fitting. if the test piping is to <br /> be installed temporarily,use care not to over tighten when in- Test Pressure For open System <br /> stalling the steel pipe threads. Fiberglass threads may be Feet of Head* Test Pressure si <br /> damaged when removing the steel threads if over tightened. 2' 1.0 <br /> Use soft-set,non-metallic thread dope only. 4' 2.0 <br /> 6' 2.5 <br /> Smith Fibercast recommends testing 3"and 4"(75 mm 8' 3.0 <br /> and 100 mm)secondary containment piping systems with 10' 4.0 <br /> air at pressures not F 12' 5.9 <br /> to exceed 10 psig *Highest point in system minus the lowest <br /> Re.(0.069 MPa). The caa point in system. <br /> most convenient — <br /> place to introduce ' These test procedures are designed specifically for a Smith <br /> air for the contain- Fibercast system. Smith Fibercast is not responsible for any <br /> ment piping pres- a damage to"other"products in the systems such as rubber <br /> sure test is at the boots,hoses etc. Please contact the manufacturer of any <br /> threaded outlet lo- t®o°s$ P,> non-SF products for a maximum test pressure and time. Do <br /> cated on the termi- not exceed SF recommendations. <br /> nation fitting near the <br /> underground storage ` tC1t # S <br /> tank. It is advanta- <br /> geous to leave the system pres- For damaged pipe and for leaking joints,Smith Fibercast <br /> surized until the installation is completed in order to moni- recommends only the repair methods listed below. Leaks <br /> for for possible damage to the containment piping system can occur if secondary contain- <br /> during additional construction. ment joints are not properly bond- <br /> The low pressure and low volume of the secondary ed. Upon completion of required ° <br /> containment piping system makes this air test a safe pro- repairs and before putting the line , <br /> cedure if normal safety precautions are followed. Refer to back into service,always pressure , <br /> air test safety precautions on pages 13-14. test the repair work according to <br /> the procedures on this page, to <br /> NOTE: 6"(150 mm)secondary containment piping is not UL assure the integrity of the system. <br /> Listed,but may be air tested when normal safety precautions <br /> A Replacing Leaking Clam Shell Secondary <br /> are followed. <br /> Containment Fittings <br /> Test procedures f `9n Service"Secondary Containment (Do not use this procedure for containment crossovers.) <br /> L Piping Systems To Include Open and Closed <br /> Systems. Example: 90°Secondary Containment Elbow — <br /> Secondary Containment piping systems can be tested after <br /> the line has been installed and in operation for a period of When cutting out and replacing <br /> time. All systems must be shut off before testing. It is recom- a secondary containment fitting, <br /> mended that where possible,the air-input valve be in different be careful not to cut the internal ®i' -- <br /> location the the pressure gauge. Please read and under- primary product pipe. . <br /> stand all safety instructions and considerations in the 1. Dissect the secondary con- <br /> Smith Fibercast Installation Manual No.82160 before tainment fitting and the i <br /> testing. secondary containment <br /> pipe around its circumfer- <br /> Closed System ence as shown by the ar- <br /> Smith Fibercast recommends testing 3"and 4"secondary rows. Remove the contain- <br /> containment open systems with air at pressures not to ex- ment elbow. <br /> ceed 10 psig. Pressure Should be left on the system for a 2. Create a pipe nipple at <br /> minimum of one hour. The test pressure should not exceed least 7 inches (180 mm) <br /> the pressure rating of any component in the piping system. long on either side of the <br /> joint by making another cut <br /> Open System(gravdy drain) around the circumference <br /> Smith Fibercast recommends testing 3"and 4"secondary <br /> 25 installation instructions <br />
The URL can be used to link to this page
Your browser does not support the video tag.