Laserfiche WebLink
0 0 RECEIVED <br />UST SYSTEM RETROFIT OR REPAIR P/ 2 4 201 <br />(Submit minimum of 3 sets of plans & applications as originals will be retained bEWIRONMENTAL <br />1. Site map enclosed? YES [ ] NO [J,/ HEALTH 13RARTMENT <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />�,� �" s�rnr SeyrSor I a lcc r <br />� 4 ►� f cQ n ®f � l" <br />e P/,,i e ed flee A r - 4o %% P6 -Za So r <br />T—, -o 1.7 <br />List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />ee6 -1- 7el� 3 ®Z6' S'CW S'o /z- <br />3 <br />