Laserfiche WebLink
K= <br />r <br />Matrix of Pipe Monitoring Applications; Gravity Flow, Vacuum (V), Pressure (P), and Interstitial Liquid Level Monitoring (ILLM) <br />(Enclosure to State Water Board leiter dated August 25, 2006, Matrix Updated September 7, 2004 <br />Manufacturer <br />UL 971 listed pipe date stamped as being; <br />...: ..,__ _ w _ <br />ed on or after July 1, 2005 <br />Open Closed <br />Secondary Containment <br />Brand <br />Type and Size <br />Fuels (min. 5 psi rating on SC per UL) (min. 50 psi rating on SC per UL) <br />(Coaxial reported as ID of PS; <br />SOS reported as OD of SC) <br />Gravity Flow or Vacuum, Pressure, or <br />Ambient ILLM Pressurized ILLM <br />Ameron <br />Dualoy 3000/1- <br />Rigid; SOS; 3" <br />MV,Cr,HB,AM <br />Gravity Flow <br />V, P <br />Rigid; SOS; 4"& 6" <br />MV,C r HB,AM <br />Gravity Flow <br />None <br />Dualoy 3000/LCX <br />Rigid; Coaxial (sticks); 2" <br />MV,Cr HB,AM <br />Gravity Flow, AILLM' <br />V, P, PILLM' <br />Rigid; Coaxial sticks • 3" & 4" <br />MV,Cr,HB,AM <br />Gravity Flow AILLM' <br />None <br />Environ <br />GeoFlex Plus "D" 5 <br />Flexible; Coaxial (coil); 3/4", 1", 11/2"1 2"1 & 3" <br />MV,AM <br />Gravity Flow <br />None <br />GeoFlex Plus "C" 3,5 <br />Flexible; Coaxial coil • 11/2" <br />MV,AM <br />Gravity Flow <br />V P <br />Franklin Fueling/APT <br />XP -150 -SC <br />Flexible; Coaxial (coil); 11/2" <br />MV,Cr,HB,AM <br />Gravity Flow <br />V <br />XP -100, 175, 200 <br />Flexible; Coaxial (coil); 1", 13/4, & 2" <br />MV,Cr,HB,AM <br />Gravity Flow <br />None <br />IPP <br />Petroplas SF2P <br />Flexible; Coaxial (coil); 2" <br />MV,CT,HB,AM <br />Gravity Flow <br />None <br />Flexible; Coaxial (coil); 3" <br />MV,CT,HB,AM <br />Gravity Flow <br />V, P <br />Flexible; Coaxial (sticks); 2" & 3" <br />MV CT HB AM <br />Gravity Flow <br />None <br />NUPI <br />Smartflex <br />Flexible; Coaxial (coil); 2", 21/2", & 5" <br />MV,CT,HB,AM <br />Gravity Flow <br />V, P <br />Flexible; Coaxial sticks • 2" 4" & 5" <br />MV CT HB AM <br />Gravity Flow <br />V P <br />OPW-FCS <br />PGF <br />Flexible; Coaxial (coil); 3/4", 1", 11/2", 2", & 3" <br />MV,AM <br />Gravity Flow <br />None <br />PGFC <br />Flexible; Coaxial (coil); 11/2" <br />MV,AM <br />Gravity Flow <br />V, P <br />OPW-Pisces II <br />C15 C20 <br />Flexible; Coaxial coil • 11/2" 2" <br />MV,AM <br />Gravity Flow <br />None <br />PetroTechnik <br />UPP <br />Flexible; Coaxial (coil); 11/2", 2" <br />MV,Cr HB,AM <br />Gravity Flow <br />V, P <br />Flexible; Coaxial (sticks); 11/2", 2"1 3"1 4" <br />MV,Cr HB,AM <br />Gravity Flow <br />V, P <br />Smith Fibercast <br />Red Thread IIA <br />Rigid; SOS; 3" & 4" <br />MV CT HB AM <br />Gravity Flow <br />V P <br />Western Fiberglass <br />Co -Flex <br />Flexible; Coaxial (coil); 3/4", 1", 1'/2", 2", & 3" <br />MV,AM <br />Gravity Flow, AILLM2 <br />None <br />Co-Flex4 <br />Flexible; Coaxial coil • 11/2" <br />MV AM <br />Gravity Flow <br />V P PILLM2 <br />1. Use only with Ameron's Brine Filled Interstitial Space Monitoring System (limited to maximum length of 344 feet). <br />2. Use only with Western Fiberglass Co -Flow Hydraulic Interstitial Monitoring System (limited to maximum length of 200 feet). <br />3. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 16, 2006, and a marking of "50 PSP' on <br />the secondary containment. <br />4. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 30, 2006,n; d a marking of "50 PSI" on <br />the secondary containment. <br />5. Geoflex is no longer being manufactured by Environ. <br />a <br />a <br />