|
K=
<br />r
<br />Matrix of Pipe Monitoring Applications; Gravity Flow, Vacuum (V), Pressure (P), and Interstitial Liquid Level Monitoring (ILLM)
<br />(Enclosure to State Water Board leiter dated August 25, 2006, Matrix Updated September 7, 2004
<br />Manufacturer
<br />UL 971 listed pipe date stamped as being;
<br />...: ..,__ _ w _
<br />ed on or after July 1, 2005
<br />Open Closed
<br />Secondary Containment
<br />Brand
<br />Type and Size
<br />Fuels (min. 5 psi rating on SC per UL) (min. 50 psi rating on SC per UL)
<br />(Coaxial reported as ID of PS;
<br />SOS reported as OD of SC)
<br />Gravity Flow or Vacuum, Pressure, or
<br />Ambient ILLM Pressurized ILLM
<br />Ameron
<br />Dualoy 3000/1-
<br />Rigid; SOS; 3"
<br />MV,Cr,HB,AM
<br />Gravity Flow
<br />V, P
<br />Rigid; SOS; 4"& 6"
<br />MV,C r HB,AM
<br />Gravity Flow
<br />None
<br />Dualoy 3000/LCX
<br />Rigid; Coaxial (sticks); 2"
<br />MV,Cr HB,AM
<br />Gravity Flow, AILLM'
<br />V, P, PILLM'
<br />Rigid; Coaxial sticks • 3" & 4"
<br />MV,Cr,HB,AM
<br />Gravity Flow AILLM'
<br />None
<br />Environ
<br />GeoFlex Plus "D" 5
<br />Flexible; Coaxial (coil); 3/4", 1", 11/2"1 2"1 & 3"
<br />MV,AM
<br />Gravity Flow
<br />None
<br />GeoFlex Plus "C" 3,5
<br />Flexible; Coaxial coil • 11/2"
<br />MV,AM
<br />Gravity Flow
<br />V P
<br />Franklin Fueling/APT
<br />XP -150 -SC
<br />Flexible; Coaxial (coil); 11/2"
<br />MV,Cr,HB,AM
<br />Gravity Flow
<br />V
<br />XP -100, 175, 200
<br />Flexible; Coaxial (coil); 1", 13/4, & 2"
<br />MV,Cr,HB,AM
<br />Gravity Flow
<br />None
<br />IPP
<br />Petroplas SF2P
<br />Flexible; Coaxial (coil); 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />None
<br />Flexible; Coaxial (coil); 3"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Flexible; Coaxial (sticks); 2" & 3"
<br />MV CT HB AM
<br />Gravity Flow
<br />None
<br />NUPI
<br />Smartflex
<br />Flexible; Coaxial (coil); 2", 21/2", & 5"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Flexible; Coaxial sticks • 2" 4" & 5"
<br />MV CT HB AM
<br />Gravity Flow
<br />V P
<br />OPW-FCS
<br />PGF
<br />Flexible; Coaxial (coil); 3/4", 1", 11/2", 2", & 3"
<br />MV,AM
<br />Gravity Flow
<br />None
<br />PGFC
<br />Flexible; Coaxial (coil); 11/2"
<br />MV,AM
<br />Gravity Flow
<br />V, P
<br />OPW-Pisces II
<br />C15 C20
<br />Flexible; Coaxial coil • 11/2" 2"
<br />MV,AM
<br />Gravity Flow
<br />None
<br />PetroTechnik
<br />UPP
<br />Flexible; Coaxial (coil); 11/2", 2"
<br />MV,Cr HB,AM
<br />Gravity Flow
<br />V, P
<br />Flexible; Coaxial (sticks); 11/2", 2"1 3"1 4"
<br />MV,Cr HB,AM
<br />Gravity Flow
<br />V, P
<br />Smith Fibercast
<br />Red Thread IIA
<br />Rigid; SOS; 3" & 4"
<br />MV CT HB AM
<br />Gravity Flow
<br />V P
<br />Western Fiberglass
<br />Co -Flex
<br />Flexible; Coaxial (coil); 3/4", 1", 1'/2", 2", & 3"
<br />MV,AM
<br />Gravity Flow, AILLM2
<br />None
<br />Co-Flex4
<br />Flexible; Coaxial coil • 11/2"
<br />MV AM
<br />Gravity Flow
<br />V P PILLM2
<br />1. Use only with Ameron's Brine Filled Interstitial Space Monitoring System (limited to maximum length of 344 feet).
<br />2. Use only with Western Fiberglass Co -Flow Hydraulic Interstitial Monitoring System (limited to maximum length of 200 feet).
<br />3. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 16, 2006, and a marking of "50 PSP' on
<br />the secondary containment.
<br />4. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 30, 2006,n; d a marking of "50 PSI" on
<br />the secondary containment.
<br />5. Geoflex is no longer being manufactured by Environ.
<br />a
<br />a
<br />
|