|
C
<br />11
<br />Matrix of Pipe Monitoring Applications; Gravity Flow, Vacuum (V), Pressure (P), and Interstitial Liquid Level Monitoring (ILLM)
<br />(Enclosure to State Water Board letter dated August 25, 2006, Matrix Updated September 7, 2004
<br />Secondary Containment
<br />Open
<br />Closed
<br />Brand
<br />Type and Size
<br />Fuels
<br />(min._5 psi rating on SC per UL)
<br />(min. 50 psi rating on SC per UL)
<br />(Coaxial reported as ID of PS;
<br />Gravity Flow or
<br />Vacuum, Pressure, or
<br />SOS reported as OD of SC)
<br />Ambient ILLM
<br />Pressurized ILLM
<br />Ameron
<br />Dualoy 3000/1.
<br />Rigid; SOS; 3"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Rigid; SOS; 4"& 6"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />None
<br />Dualoy 3000/LCX
<br />Rigid; Coaxial (sticks); 2"
<br />MV,CT,HB,AM
<br />Gravity Flow, AILLMI
<br />V, P, PILLM1
<br />Rigid; Coaxial sticks • 3" & 4"
<br />MV,CT,HB,AM
<br />Gravity Flow AILLMI
<br />None
<br />Environ
<br />GeoFlex Plus "D" 5
<br />Flexible; Coaxial (coil); 3/4", 1", 11/2", 2", & 3"
<br />MV,AM
<br />Gravity Flow
<br />None
<br />GeoFlex Plus "C" 3, 5
<br />Flexible; Coaxial coil • 11/2"
<br />MV,AM
<br />Gravity Flow
<br />V P
<br />Franklin Fueling/APT
<br />XP -150 -SC
<br />Flexible; Coaxial (coil); 11/2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />v
<br />XP -100, 175, 200
<br />Flexible; Coaxial (coil); 1", 13/4, & 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />None
<br />IPP
<br />Petroplas SF2P
<br />Flexible; Coaxial (coil); 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />None
<br />Flexible; Coaxial (coil); 3"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Flexible; Coaxial sticks • 2" & 3"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />None
<br />NUPI
<br />Smartflex
<br />Flexible; Coaxial (coil); 2"'21/2" 1 & 5"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />v, P
<br />Flexible-, Coaxial (sticks); 2" 4" & 5"
<br />MV CT HB AM
<br />Gravity Flow
<br />V P
<br />OPW-FCS
<br />PGF
<br />Flexible; Coaxial (coil); 3/4", 1", 11/2", 2", & 3"
<br />MV,AM
<br />Gravity Flow
<br />None
<br />PGFC
<br />Flexible; Coaxial (coil); 11/2"
<br />MV,AM
<br />Gravity Flow
<br />V, P
<br />OPW-Pisces II
<br />C15 C20
<br />Flexible; Coaxial coil • 11/2" 2"
<br />MV,AM
<br />Gravity Flow
<br />None
<br />PetroTechnik
<br />UPP
<br />Flexible; Coaxial (coil); 11/2", 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Flexible; Coaxial (sticks); 11/2", 2"1 3"1 4"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Smith Fibercast
<br />Red Thread IIA
<br />Rigid; SOS• 3" & 4"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V P
<br />Western Fiberglass
<br />Co -Flex
<br />Flexible; Coaxial (coil); 3/4", 1", 11/2", 2", & 3"
<br />MV,AM
<br />Gravity Flow, AILLMZ
<br />None
<br />Co-Flex4
<br />Flexible; Coaxial coil • 11/2"
<br />MV AM
<br />Gravity Flow
<br />V P PILLM2
<br />1. Use only with Ameron's Brine Filled Interstitial Space Monitoring System (limited to maximum length of 344 feet).
<br />2. Use only with Western Fiberglass Co -Flow Hydraulic Interstitial Monitoring System (limited to maximum length of 200 feet).
<br />3. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 16, 2006, and a marking of "50 PSI" on
<br />the secondary containment.
<br />4. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 30, 2006, and a marking of "50 PSI" on
<br />the secondary containment.
<br />5. Geoflex is no longer being manufactured by Environ.
<br />
|