Laserfiche WebLink
Piping information continued - <br />Check <br />Code <br />Section <br />Box <br />Code <br />Overspill containment having minimum capacity of 5 gallons provided at each tank fill location. <br />Section <br />Manufacturer Model <br />23 CCR <br />Approved overfill prevention device provided at each tank fill location. <br />isz9o.12(cxl) <br />piping compatible with material intended to be stored. <br />25290 .c 1 <br />❑ Alert the transfer operator when the tank is 90 percent full by restricting the flow into the tank or <br />23 CCR <br />Design and construction of piping approved by independent testing organization (e.g. UL). <br />2631 <br />❑ Restrict delivery of flow to the tank at least 30 minutes before the tank overfills, provided the <br />restriction occurs when the tank is filled to no more than 95 percent capacity; and activate an audible <br />23 CCR <br />Piping, including vent lines, sloped toward tanks with minimum 1/4 inch sloe per 1 foot of run. <br />HSC <br />Tie -downs, when used, constructed of non -corrosive material or coated steel. <br />25290.1(k) <br />❑ Provide positive shut-off flow to the tank when the tank is filled to no more than 95 percent of <br />25290.2®&O) <br />Vapor recovery, fill riser, and vent line piping are secondarily contained. <br />PREVENTION:G. OVERSPILL/ OVERFILL /A, <br />Check <br />Box <br />Code <br />Section <br />23 CCR <br />Overspill containment having minimum capacity of 5 gallons provided at each tank fill location. <br />2635(b) <br />Manufacturer Model <br />23 CCR <br />Approved overfill prevention device provided at each tank fill location. <br />2636(b) <br />Choose One of the following methods: <br />❑ Alert the transfer operator when the tank is 90 percent full by restricting the flow into the tank or <br />triggering an audible visual alarm <br />23 CCRLd <br />2635(a�2) <br />❑ Restrict delivery of flow to the tank at least 30 minutes before the tank overfills, provided the <br />restriction occurs when the tank is filled to no more than 95 percent capacity; and activate an audible <br />23 CCR <br />alarm at least five minutes before the tank overfills <br />2635(b)(2) <br />Tie -downs, when used, constructed of non -corrosive material or coated steel. <br />❑ Provide positive shut-off flow to the tank when the tank is filled to no more than 95 percent of <br />capacity. <br />❑ Provide positive shut-off of flow to the tank so that none of the fittings located on the top of the <br />tank are exposed to product due to overfilling. <br />Manufacturer Model <br />Check <br />Box <br />Code <br />Section <br />❑ Fiberglass reinforced plastic (FRP) <br />23 CCR <br />Piping corrosion protection: ❑ S eel with cathodic protection or impressed current <br />2636(b) <br />Steel isolated from contact with backfill <br />RP or equivalent non-metallic exterior coatings or coverings <br />Tank corrosion protection: ❑ Sacrificial Anode <br />23 CCRLd <br />2635(a�2) <br />❑ Steel tank with field installed cathodic protection or impressed <br />p p <br />current <br />Tie -downs, when used, constructed of non -corrosive material or coated steel. <br />Revised 8/3/07 <br />