Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: <br />Complete the following checklist: <br />fe x <br />Ef-Yes <br />® No* <br />Is the audible alarm operational? <br />Ef Yes <br />® No* <br />Is the visual alarm operational? <br />Ll Yes <br />® No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Ld Yes <br />® No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />® Yes <br />® * <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />N/A <br />operational? <br />® Yes <br />® No* - <br />/A <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ® Sump/Trench Sensors; ® Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ® No. <br />® Yes <br />®N * <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating ro erl ? If so, at what percent of tank capacity does the alarm trigger? % <br />® Yes* <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />_ <br />and list the manufacturer name and model for all replacement arts in Section E, below. <br />L] Yes* <br />o <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br />.., <br />Product; ® Water. If yes, describe causes in Section E, below. <br />Ef s" <br />13 No* <br />Was monito <br />aripg astern set-up reviewed to ensure proper settin ? Attach set up reports, if applicable <br />Yes <br />®No* <br />Is all monitoring a ui Ment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />Page 2 of 3 03/01 <br />