My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2009-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:20:05 PM
Creation date
6/3/2020 9:44:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2014
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2009-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Sped) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run #1 <br />Piping Run #2 <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run# Piping Run# <br />rPipingial: <br />Poly Plastic <br />Poly Plastic <br />facturer: <br />APT <br />APT <br />Piping Diameter: <br />1 '/2" <br />1 '/2" <br />Length of Piping Run: <br />Approx. 32' <br />Approx. 32' <br />Product Stored: <br />Fuel Oil <br />Fuel Oil <br />Method and location of <br />piping -run isolation: <br />Test boot at <br />Piping Sump <br />Test boot at <br />Piping Sum <br />Wait time between applying <br />pressure and startingtest: <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />11:20 <br />11:20 <br />Initial Reading (RI): <br />5.1 Psi <br />5.4 Psi <br />Test End Time: <br />12:20 <br />12:20 <br />Final Reading (RF): <br />5.1 Psi <br />5.4 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ FaiI <br />Pass ❑ Fail Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />System is Suction Supply and Gravity Return for Emergency Generator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.