My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1987-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 4:35:41 PM
Creation date
6/3/2020 9:44:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1995
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1987-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />L—A <br />— rw. mw a-10) <br />15. TANK TO TEST 15a. BRIEF DIAGRAM OF TANK FIELD <br />1✓ / <br />1-71 <br />Idan by potWon <br />Brand KJ Graft . <br />17. FILL -UP FOR TEST <br />Stick Water Bottom <br />before Fill -up in. in. <br />to fr Tank Diameter <br />vrrY <br />16. CAPACITY <br />Nominal Capacity /® Mo <br />Gallons <br />By most iocurato ` <br />capacity chart available <br />Gallons <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK ❑Water in tank ❑ une(s) wing tested with LVLLT <br />Sas manual sections applicable. Check below and record procedure In log (27). ❑ High water table in tank excavation <br />Live maximum allowable test pressure for all tests. 19. TANK MEASUREMENTS FOR <br />Four pound rule does not apply to doublewelled tanks. <br />Complete section below: TSTT ASSEMBLY <br />_.1.�. <br />% <br />t. Is four pound rule required? <br />2. Height to 12' mark from grade <br />3. Pressure at bottom of tank <br />4. Pressure at top of lank <br />,�-lett <br />Y-0 No ❑ <br />2661 ;n. <br />Bottom of tank to grade* ............................ in. <br />Add 3U" for "T' probe assy........................... 30 in. <br />Total tubing to assemble — approximate ............. _ _ in. <br />20. EXTENSION HOSE SETTING <br />P.S.I. <br />Tank top to grade' .................................. in. <br />Extend hoes on auction tube 6" or more <br />VVVVMMMM <br />P.S.I. <br />below tank top ...................................... In. <br />'It Fill pipe extends above grade, use top of fill. <br />of burial in. <br />USE WITH THERMAL SENSOR <br />PN5039 (Blue Box) <br />dia. in. <br />table to lank bottom in. <br />22. Thermal -Sensor reading after circulation <br />digits <br />IF <br />Between <br />23. Digits per IF in range of expected change <br />digits <br />NOTES: <br />(a) <br />24a. IF USING THERMAL SENSOR DTS-2000 <br />26. <br />OR OC -2000 WHICH READ 1000 DIGITS <br />/ \ <br />PER OF TRANSFER 1000 TO LINE 26, <br />Volume change per IF (25 or 24b) <br />DIGITS PER OF IN TEST RANGE. <br />The above calculations are to be used for dry soil conditions to <br />establish a positive pressure advantage, or when wing the four pound <br />rule to compensate for the presence of subsurface water in the tank <br />area. <br />Refer to N.F.P.A. 30, Sections 2-3.24 and 2-7.2 and the tank <br />manufacturer regarding allowable system tat pressures. <br />Nate Of tee <br />From <br />❑ Station Chart <br />Tank Manufacturer's Chart <br />Company Engineering Data <br />❑Charts supplied with Tank Tester <br />❑ Other <br />Total Gallons <br />ea.Reading Y <br />Inventory in Tank 5 <br />Water Bottom <br />Top off equipment + AD <br />Total Dwntity —L_S'Z- <br />1 21. VAPOR RECOVERY SYSTEM ❑ Stage 1 Rage it <br />24b. COEFFICIENT OF EXPANSION <br />RECIPROCAL METHOD <br />Type of Product ........................................ <br />Hydrometer Employed .................................. H <br />Temperature In Tank1 <br />After Circulation ........................................ r g F <br />Temperature of Sample ................................. IF <br />Difference (o!-) ......................................... 1.IF <br />Observed A.P.I. Gravity ................................. <br />Rerciproca te Pape s G <br />o <br />Total quantity in Reciprocal <br />full tank (til) <br />Vdume change in <br />this tank per IF <br />Transfer to Line 26s <br />_ <br />24c. FOR TESTING WITH WATER les Table C & D <br />Water Temperature after Circulation <br />Table C from Thermal Sensor ............................ •F <br />Coefficient of Water <br />TableD ................................................ <br />Added Surfactant? ❑ Yes ❑ No Transfer COE to Line 25b. <br />25. (a) x <br />(b) <br />(c) <br />_ <br />gallons <br />Total quantity in <br />fulltank 7) <br />40_ <br />Coefficient of expansion for <br />involved p oduet <br />Volume change in this tank <br />per IF <br />(a) <br />26. <br />/ \ <br />This is <br />Volume change per IF (25 or 24b) <br />Digits per •F in test <br />Volume change per digit <br />teat <br />Range (23 or 24s) <br />Compute to 4 decimal pieces. <br />factor (a) <br />
The URL can be used to link to this page
Your browser does not support the video tag.