My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1987-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 4:35:41 PM
Creation date
6/3/2020 9:44:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1995
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1987-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. TANK TO TEST <br />.__ <br />Idefty by position . <br />rand and Graft <br />17. FILL -UP FOR TEST <br />C. <br />mares — arra xromw/ <br />wry <br />15a. BRIEF DIAGRAM OF TANK FIELD ! 16. CAPACITY <br />Stick Water Bottom 0.®P <br />before Fill -up in. in. <br />to )C" Gallons Tank Diameter <br />ioll <br />Nominal Capacity / ® 00 <br />Gallons <br />By most aoalrate <br />capacity chart available 4;P71 O&V <br />Gallons <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK ❑ Water in tank ❑ Lfne(s) being tested with LVLLT <br />See Manuel Sections applicable. Check below and record procedure in log (27). ❑ High water table in tank excavation <br />Use maximum allowable test pressure for all tests. 19. TANK MEASUREMENTS FOR <br />Four pound rule does not apply to doublewalled tanks. <br />TSTT ASSEMBLY <br />Complete section below: <br />1. Is four pound rule required? <br />2. Height to 12° mark from grade <br />3. Pressure at bottom of tank <br />4. Pressure at top of tank <br />h of burial <br />dia. <br />lr table to tank bottom <br />NOTES: <br />Yea yJ No ❑ <br />in. <br />P.S.I. <br />P.S.I. <br />r in. <br />in. <br />The above calculations are to be used for dry soil conditions to <br />establish a positive pressure advantage, or when using the four pound <br />rule to compensate for the presence of subsurface water in the tank <br />area. <br />Refer to N.F.P.A. 30, Sections 2-3.2.4 and 2-7.2 and the tank <br />manufacturer regarding allowable system test pressures. <br />Bottom of tank to graft' ............................ in. <br />Add 30" for "T" probe assy........................... 30 in. <br />Total tubing to assemble — approximate ............. in. <br />20. EXTENSION HOSE SETTING <br />Tank top to grade ............................. <br />Extend hose on suction tube 6" or more <br />below tank top ................................ <br />-If Fill pipe extends above grade, use top of fill. <br />USE WITH THERMAL SENSOR <br />PN5039 (Blue Box) <br />22. Thermal -Sensor reading after circulation <br />Between <br />23. Digits per •F in range of expected change <br />in, digits <br />24a. IF USING THERMAL SENSOR DTS-2000 <br />OR OC -2000 WHICH READ 1000 DIGITS <br />PER OF TRANSFER 1000 TO LINE 26, <br />DIGITS PER OF IN TEST RANGE. <br />arae <br />uareor lam <br />From <br />❑ Station Chart <br />Tank Manufacturer's Chart <br />Company Engineering Data <br />❑ darts supplied with Tank Tester <br />❑ Other <br />Total Gallons <br />ea. Reading <br />Inventory in Tank <br />Water Bottom <br />Top off equipment + <br />Total Quantity <br />21. VAPOR RECOVERY SYSTEM ❑ stage 1 Xstage if <br />24b. COEFFICIENT OF EXPANSION <br />RECIPROCAL METHOD <br />Type of Product ............................... <br />Hydrometer Employed ......................... <br />Temperature in Tank <br />After Circulation ............................... <br />Temperature of Sample ............. <br />Difference (•/-) .................................. <br />24c. FOR TESTING WITH WATER see Table C 6 D <br />Water Temperature after Circulation <br />Table C from Thermal Sensor ............................ •F <br />Coefficient of Water <br />TableD ................................................ <br />Added Surfactant) ❑ Yes ❑ No Transfer COE to Line 25b. <br />25. (a) <br />Observed A.P.I. Gravity ................................. ' <br />. <br />Reciprocal Pages _S <br />gallons <br />•F <br />/ <br />�i< s <br />6A 'm,/_ <br />Volume change in this tank <br />Total quantity in Reciprocal <br />Volume change in <br />jJ <br />G✓' .. <br />full tank (17) <br />this tank per •F <br />This it ' <br />.... :.:, Volume change <br />Transfer to Line 26a. <br />24c. FOR TESTING WITH WATER see Table C 6 D <br />Water Temperature after Circulation <br />Table C from Thermal Sensor ............................ •F <br />Coefficient of Water <br />TableD ................................................ <br />Added Surfactant) ❑ Yes ❑ No Transfer COE to Line 25b. <br />25. (a) <br />X (b) <br />_ W <br />gallons <br />Total quantity in <br />Coefficient of expansion for <br />Volume change in this tank <br />full to ) <br />.. <br />26.- (si <br />jJ <br />G✓' .. <br />involved product <br />�} <br />_.—..=vim Yf V.V <br />per •F <br />_ ®,� Sj 6/' <br />This it ' <br />.... :.:, Volume change <br />per •F (25 or 24b) <br />, ,.�,..: Digits per IF in test ._ .: <br />Volume change per digit <br />that <br />' <br />.- <br />.... <br />Range (23 or 24a) <br />Compute to 4 decimal places. - <br />factor (a) 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.