My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1987-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 4:35:41 PM
Creation date
6/3/2020 9:44:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1995
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1987-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Idams <br />Uorecislon <br />Unsfir umentation, Co. <br />3031 TISH WAY, SUITE 200 * SAN JOSE, CAUFORNIA 95128 <br />(408) 244-6739 & FAX (408) 244-6801 <br />ARCO Products Company <br />API/Ronan X76S Leak Detection Certification <br />Facility # 2/3: Date 211-2�1 9�_ <br />Address.- 2q0,?&(AV1A.140* <br />vas/ V. <br />I Verify Intrinsicr Safety <br />Proper field wire termination <br />Proper power wiring with earth ground and individual breaker <br />Complete isolation of I.S. field wiring from any other wiring <br />especially in gutters <br />vol"'Proper use of E.Y.S. fittings <br />II. Check for proper panel installation <br />V-* -Panel mounted in a nonhazardous location <br />v,"'Panel is accesible to station operators <br />v""All field wiring is labelled at terminal 'strip or adjacent gutter <br />All wiring to panel is brought through appropriate punch -outs <br />III Check for proper probe installation <br />ve"Piping sump sensors suspended within one inch of sump bottom <br />Double walled FRP tank sensors(LS-7) installed at bottom of tank <br />with a pull wire circumventing the primary tank and accessible <br />from grade. <br />Annular space risers should be sealed watertight with field <br />wiring penetrating using cable grips or other apprpriate method <br />✓ Probe leads terminating in a watertight J -box <br />IV Check system operation <br />✓ Verify proper fuctioning of alarm horn and lights by pushing <br />the test button <br />
The URL can be used to link to this page
Your browser does not support the video tag.