My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/16/99 18:11 FAX 425 251 8782 . BARGHAUSEN 003 <br /> Doug Wilson <br /> San Joaquin County <br /> Environmental Health Division -3- March 11, 1999 <br /> Rmmm: See attached detail and cat sheet. <br /> 13. Ckt sheet for oflex piping was submitted. Is Geojkx piping going to be installed? Pt <br /> verj&. <br /> R21p9m: No, Geoflex is not to be installed and we are to use double wall clamsheff Ameroft <br /> FRP piping design per the submittal. We had sent information on Environ sump penetration <br /> fittings and believe you are confused as to the information sent. <br /> 14. Aird pany approvaljor FlexGuardflex boot under dispenser sunW. <br /> &wm: Third party approval for flex boot and under dispenser sump to follow. We will <br /> forward these to you when we receive them. <br /> 15. Monitoring and response plan diat inchda in-Une sump and vapor pod <br /> EAmgnw—: ARCO will be writing a new monitDring and response plan that includes the new <br /> in-line sump and vapor pod as well as the other tanks at that site. We will fbrward the new plan <br /> when received. <br /> 16. Form Bjbr new Av*and vaporpod <br /> Room See attached Form B's for new tank and vapor pod. <br /> 17. Contractor cen*,ate of training issued by Av*and piping ftVu(racjUreys. <br /> R=m—e: Henderson Construction is obtaining those certificates and they will be forwarded to <br /> you upon it receipt. <br /> This concludes the comments for the above-noted plan review and our responses. if you have any questions, <br /> comments,or Rulher chirification is needed,please contact me at this office at(425)251-6222. we appreciate <br /> your assistance in this matter. <br /> ily, <br /> /R e.smKa <br /> Stephen H. Kirk <br /> Design Engineer <br /> SII els <br /> 4009c.005 <br /> cc: Bill Merchant, Atlantic Richfield Company <br /> Bill Zapka, Atlantic Richfield Company <br /> Stacy Anastasio, Henderson Construction <br /> Jay S. Grubb, Barghausen Consulting Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.