My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/12/99 16:34 FAX 425 251 8782 BARGRAUSEN R025/029 <br /> A- <br /> MODERN WELDING- CO. INC. <br /> em FINISHING INSTRUCTIONS <br /> FORGLASTEEL r6A TANKS PRIOR TO BACKFILLING <br /> ANK <br /> _rG LA S_TE EL UMER J <br /> PROVIDED YOU FOR THE FIELD APPLICATION OF _QWLUJ S. <br /> QL <br /> FIBERGLASS MATTING AND MYERS FOR UNUSED TANK CONNECTIONS, TANK A. VERIFY THAT THE PIPE PLUG IS <br /> LIFTINt LUGS. AND PIPE CONNECTIONS. PRO PERLY TIGHTENED. <br /> BY FOLLOWING THE 'EL92JI99-IMIL B. SAND AREA WERE THE NAT <br /> RU9JM1, YOU WILL ENSURE THE <br /> PROPER SEALING AND CORR13SIDN PROTECTION FOR YOUR NEW MODERN 15 TO BE APPLIED. <br /> GLASTEEL.'" UNDERGROUND STORAGE TANK. C. MIX AND IMPREGNATE NAT <br /> D. PLACE IN IMPREGNATED <br /> 1-2 oz, bottle of catalyst. MAT OVER THE UNUSED PIPE E TI <br /> CONNECTION. AN BY USING <br /> 1-gallon of resin. <br /> ADDITIONAL RESIN AND-7- <br /> 1-PInt Of Ketone for cleanup. PAINT BRUSH DAB THE f <br /> I-MIXIng cup. <br /> E. <br /> 2-stirring sticks. <br /> NAT IN PLAC <br /> 1-piece of sand r. dl D_AREA <br /> 2-1 1120 paint brushes. <br /> 2-spare f1ttIna cover mots 9 96 94. <br /> 4-olpe connection is 0 r sq. precut for 41 pipe. <br /> 4-pipe matting strips a I* x 483. <br /> 2-pipe connection mats 1 7' sq. precut for 2' pipe. A. SAND AREA WHERE LIFTING LUG <br /> 2-pipe matting strips @ I" x 244, COVER AND NAT ARE TO BE PLACED <br /> 2-11berglass preformed 11runo lug covers. B. COAT BOTTOM OF PREFORMED <br /> 2-precut Ilrtlnu In Cover nets. FIBERGLASS COVER WITH RESIN. <br /> 2ff_ACEP KeNATI . SELECT THE AREAS YOU ARE GOING TO PLACE AND PLACE OVER LIFTING LUG. <br /> MATTING, USING THE ENCLOSED PIECE OF SANDPAPER. ROUGH-UP THE AREA C. IMPREGNATE PRECUT NAT AND <br /> WHERE YOU ARE GOING TO APPLY FIBERGLASS. PLACE OVER PREFORMED FIBE@GLASS <br /> COVER.OAB NAT IN PLACE WITH COAT, OTTON W/ RESI <br /> 3.ft5RL28W.Mj&Uffi: PRIOR TO MIXING THE RESIN AND CATALYST ADDITIONAL IN IF REQUIRED. <br /> TOCATHE R. LOCATE AND PLACE THE ITEMS THAT WILL BE DMGNATEO <br /> NEAR THE LOCATION WHERE YOU ARE GOING 70 INSTALL THEM. MIX THE 0 <br /> RESIN AND COMPLETLEY SATURATE THE MATTING. FT <br /> WJEM: AFTER A DAMN HAS BEEN MIXED, ONE HAS APPROXIMATELY 10 <br /> MINUTES WORKING T114E BEFORE THE RESIN CURING PROCESS IS PARTIALLY FIGURE 7A <br /> COMPLETED, THIS ALLOTED TIME 15 USED ON 70-F. TEMPERATURE. IF <br /> THE AIR TE14PERATURE 15 1000F. FOR EXAMPLE, ONE HAS APPROXIMATELY 8.PIPE CMCIIQN CEM. <br /> -NI £S BEFORE THIS CURING PROCESS OCCURES. A. SAND AREAS WHERE MATTING IS TO <br /> BE PLACED ON TANK AND PIPE. <br /> 4.9mufflosAuktu-nuffi: WHEN MIXING THE CATALYST AND B. SATURATE MATTING WITH RESIN AND <br /> RESIN. MIX ONLY THAT ANNOUNT YOU CAN APPLY IN THE RLLOTED TIME. PLACE NAT AROUND PIPE AS SHOW <br /> USE THE FOLLOWING MIXING CHART FOR VARIOUS ORTCHES, AND IF YOU IN FIGURE 8A. <br /> ARE UNFAWLIAR WITH RESINS. IT IS SUGGESTED THAT YOU MIX THE PRECUT MATTI& <br /> SMALLEST BATCH AS A SAMPLE To DETERMINE THE REQUIRED CURING TIME 'PE <br /> �S <br /> 'S Too <br /> S S�" <br /> P <br /> r <br /> FOR THE RESIN To SETUP. <br /> U-511 UIALY—ST <br /> 2-qts. tD I-oz. SANDED A <br /> I-Qt. to 1/2-oz. $A AREA <br /> 1-pt. to 1/4-oz- <br /> 1-cup to 1/8-02. FIGURE 8R <br /> :R[51N APPLICATION: MEN APPLINING THE RESIN TO THE MATTING. <br /> SATURATE OR IMPREGNATE THE MATTING BY DABBING THE RESIN INTO THE <br /> MATTING. 1` MAT STRIP <br /> DO,NOT BRUSH THE RESIN ONTO THE MATTING. BECAUSE YOU CANNOT COAT <br /> THE MATTING PROPERLY. DAB RESIN T C. DAB PRECUT NAT INTO PLACE <br /> 9 WITH ADDITIONAL RESIN IF <br /> IMPR ATE MAT REQUIRED. <br /> 1). SATURATE I` WIDE NAT STRIP. <br /> STARTING AT THE RA5E OF THE <br /> PIPE. WRAP THE I" STRIP <br /> AROUND THE PIPE, LAPPING THE <br /> NAT STRIP 1/2 ITS WIDTH, SEE <br /> FIGURE 69. FIGURE 08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.