My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 05 '99 14:40 FR CONTAINMENT SOLUTIONS814 542 5020 TO 9-15108958426 P.02/20 ., <br /> a <br /> TIORb <br /> A DENAU COMPANY <br /> PLEASE REVIEW THE FOLLOWING INFO TION AND FORWARD TO YOUR <br /> FIELD SUPERVISOR TO AVOID DELAYS. ANY DELAYS ON SITE DUE TO <br /> PERSONNEL OR TANK(S) NOT PREPARED PROPERLY WILL INCREASE JOB <br /> COST, <br /> Underground Tank Entry for Inspection or Remanufacturing Pace I of 3 <br /> I. Reinforce or shore sides of excavation so pad will not undermine, and material will not <br /> migrate into excavated hole(per OSHA Standard 1926.650 through 1926.652) <br /> -Entry through encap- will require one half of endcap diameter exposed. The area <br /> excavated should star where the end cap begins to curve downward. Dig down 4', back 6'. <br /> and S' wide. (See drawing attached) <br /> - Entry through manway• already installed in tank, will require the removal of all <br /> pumps or vents installed in the manway lid. The full 22" diameter manway opening will be <br /> utilized for tank entry, so it cannot be obstructed in any way. Loosen the manway cover <br /> before the Technician arrives on site. <br /> 2. Tank must be empq. of fuel ( within 1" of bottom of tank ) - Note: The Technicianwill <br /> gent the tank to atmosphere to lower explosion levels in the tank to less than 10%LEL.. <br /> Get the tank as empty as possible. The more product removed from the tank will reduce the <br /> time required by the technician to vent. <br /> 3. An open top 55 gallon drum must be provided for Technician's use for removing or <br /> soaking up any residual product left in the tank. This drum is considered hazardous waste, <br /> and will be the responsibility of the owner or contractor to dispose of accordingly. If the <br /> tank is extremely dirty. you may be required to contract the services of a tank cleaning <br /> company, F• <br /> 4. A safety person must be available to assist the Technician at all times This person must <br /> be clean shaven, and able to speak English. This person must have no other duties other <br /> than assisting and monitoring the Technician. This person is supplied by the owner or <br /> contractor.The same safety person should be assigned each daily. This will minimize the <br /> Linc r G�tAlb®d *u6. f�c Gs svu via Fr V jiva Fa v%#W%A A Ga tuna F%i.ai.7. <br /> NOTE: The safety person MUST have a completion of 40 HOURS OF TRAINING <br /> IN THE FIELD APPLICATIONS OF HEALTH AND SAFETY in compliance with <br /> OSHA 29 CFR 1910.120 ( ZWOPER). <br />
The URL can be used to link to this page
Your browser does not support the video tag.