My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 05 '99 14:43 FR CONTAINMENT SOLUTIONS814 542 5 TO 9-15108958426 P.�i20 <br /> .. <br /> FLUID CONTAINMENT .. <br /> section SAEM <br /> bulletin 3 <br /> date 2 a4n <br /> supersedes 1/4t8 <br /> SAFETY PROCEDURE - MMjjGRO= PETROLEUM Y <br /> The following procedure will be employed whenever Fluid Containment Field <br /> Technician has cause to enter an underground petroleum storage tank, either <br /> for inspection or repair. Any additional state, local, or federal <br /> regulations must be observed. Additional customer requirements should be <br /> cleared through Field Service <br /> General Requirements <br /> 1. Only sir-powered mechanical tools are to be employed. <br /> 2. The tank is to be mechanically ventilated at all times that a man is <br /> inside the tank. <br /> 3. Use of an air-supplied mask with Egress cylinder is required at all <br /> times unless it can be absolutely ascertained that the tank has never <br /> contained any product. <br /> 4. An approved safety harness with lifelines attached must be worn by the <br /> man entering the tank. <br /> 5. Tanks having an a sphere over 130°F are not to be entered. Work no <br /> longer than 60 minutes in tanks at 100.130 degrees F. <br /> 6. Only an approved explosion-proof light source is to be used. <br /> 7. A completed Confined Space Entry.Permit is required to be posted prior <br /> to each tank entry, visible to those in proximity. <br /> S. A reliable safety observer, with no duties other than assisting and <br /> monitoring the OCT technician, mast be available at all times. The <br /> safety observer is allowed to pass toolsand similarly assist the marc, <br /> in the tank as , long as voice and preferably visual contact is <br /> maintained. If the safety observer must leave the tank, the technician <br /> is to halt work and exit the tank. <br /> In addition to the primary safety observer, one (1) additional roan <br /> (stand-by) must be within bearinS distance and aware of the air horn <br /> signal to help in a. physical rescue if required. <br /> A SCBA safety harness and an air horn must be available for immediate <br /> use by the safety observer. <br /> 9. No flash pictures are to be taken in the tank, even with recognized <br /> diver's camera. <br />
The URL can be used to link to this page
Your browser does not support the video tag.