My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUG 12 2005 15:50 FR BLUELINE TECHNOLOGIES 15306715208 TO 19166469683 P.03i11 <br /> pile L*8727 Vol 1 sec 1 <br /> Md <br /> M a" 285 ®rife Yuba C*Y,CA 95991 <br /> Tel: (530)671.5080 Far(530)671-5208 <br /> T C N N 0 4 0 0 1 t? a wwwbkm4natechnologko.com <br /> T <br /> 1� ~ <br /> ' } <br /> 3) Q /► 92ft <br /> t M 21 2090 <br /> • Ensure all bulkhead and Sump surfaces are CWMled with ACOWM <br /> and dry before Instalizition <br /> • Sand merglass sumps lightly to rertars gel coat <br /> • Use non bbited side .boot as a drilling template and drill holes for the <br /> appropriate bolt pattern <br /> • Apply a 1/2 inch bead of Blue bond 801 Gasket materia)to the boot <br /> flanges <br /> • Install back plate bulkhead(outside sump)Pushing abboftthrough <br /> the drilled holes <br /> • 'Install'front bulkhead over the protruding bolts ' <br /> • Tighten all screws and nuts to maximum incur Ib torque <br /> • Tighten all band clamps around pipe, not to exceed 25+34 Inch bb <br /> torque <br /> • Remove any excess Blue bond 801 from sump wag around the boot <br /> flange <br /> LED.) <br /> ND40106671 <br />
The URL can be used to link to this page
Your browser does not support the video tag.