Laserfiche WebLink
:ilonitoring System Certification <br /> Site Address: 2133:2908 BENJAMIN HOLT DR,CA 95207 Date ofTestinWServicing_ <br /> D. Results of Testing/Servicing <br /> Software Version Installed <br /> Com the following checklist: <br /> Y No* Is the audible alarm operational? <br /> No Is the visual alarm o erational? <br /> e , No* Were all sensors visually ins ectad,functionally tested, and confirmed operational?. <br /> es No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> Yes If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> NIA operational? <br /> _ryes No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> NIA monitoring system detects s leal4 fails to operate, ori ectrically disconnected? Ifyes: which sensors initiate <br /> positive shutdown? (Check all that apply) GJ,12 umpJTrenchSens ors; ri—sp e­n s er C oantAiduentSensors. <br /> Did you confinnpositive shutdown due to leeks and sensor failurefdisconnection? es; 0 No. <br /> Yes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> /A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill oin s and operating properly? If so, at what percent of tank capacity does the alarm trigger?. ....% <br /> Yes* o Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> d list the manufacturer name and model for all replacement arts in Section Ibelow. <br /> Yes* o Was liquid found inside any secondary containment systems designed as dry systems? (Check all Matgn aly) <br /> Product; RWater. If yes,describe causes in Section E,below. <br /> e No* Was monitoring system setu reviewed to ensure proper settings? <br /> es No* I Is all monitoring equipment oerational 2er manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> F E. Comments <br /> i <br /> f <br /> Page 2 of 3 03M I <br />