My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> SWRCB,January 2002 Page of <br /> t <br /> 20 3 3 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer ndustry Standard Professional Engineer <br /> Other(Sped) <br /> Test Method Used: Pressure Vacuumy rostat c <br /> Other(Spec) <br /> OeEquipment Used: 0 EquipmentResolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Depth: �� 2me between applying <br /> re/vacuum/water and <br /> starting test: C>I-L Aq M 1,91- JD A, D <br /> Test Start Time: F! 64- '1 C7 d� <br /> Initial Reading(Rj): <br /> Test End Time: ( 9;CIO 9.16L) 9` <br /> Final Reading(RF): .5 1 j " 1 <br /> Test Duration: /2 :Rl(- Z/"X— <br /> Change in Reading(RF-Rj): V( SIX <br /> Pass/Fail Threshold or n <br /> Criteria: Pis �G SS G4SS �qss �s:s <br /> Test Result: <br /> MEL- <br /> FT7 M . �-7 �., T"7 9 `3 <br /> Comments—(include information on repairs made prior o testing, an recom n e o ow-up or ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.