Laserfiche WebLink
e <br /> SWRCB,January 2002 Page of <br /> t <br /> 20 3 3 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer ndustry Standard Professional Engineer <br /> Other(Sped) <br /> Test Method Used: Pressure Vacuumy rostat c <br /> Other(Spec) <br /> OeEquipment Used: 0 EquipmentResolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Depth: �� 2me between applying <br /> re/vacuum/water and <br /> starting test: C>I-L Aq M 1,91- JD A, D <br /> Test Start Time: F! 64- '1 C7 d� <br /> Initial Reading(Rj): <br /> Test End Time: ( 9;CIO 9.16L) 9` <br /> Final Reading(RF): .5 1 j " 1 <br /> Test Duration: /2 :Rl(- Z/"X— <br /> Change in Reading(RF-Rj): V( SIX <br /> Pass/Fail Threshold or n <br /> Criteria: Pis �G SS G4SS �qss �s:s <br /> Test Result: <br /> MEL- <br /> FT7 M . �-7 �., T"7 9 `3 <br /> Comments—(include information on repairs made prior o testing, an recom n e o ow-up or ailed tests) <br />