My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/16/2004 10:59 12093651 3 TANKNOLOGY PAGE 04 <br /> Monitoring System Certification <br /> Site Address: 2905W. BENJAMIN HOLT Date of Testing/ServIew. 03/29/2004 <br /> 21-5 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 120,02 <br /> Complete the following chocklist: <br /> Yes No' Is the audible alarm operational? <br /> Yet L]No- Is the visual alarm operational? <br /> ns -L:w Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> RX Y-- [I No Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> interfere with their proper operation? <br /> Yes No Lj NIA If alarms are relayed to a remote monitoring station,Is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine aUtOrnatiC211y shut down if the piping secondary containment <br /> 0 Yea [:]No- Lj N/A monitoring system detects a leak,falls to operate,or is electrically disconnected?If yes:which sensors Initiate positive <br /> shut-down?(check all that apply) E] Sump/Trench Sensors; Z Dispenser Containment Sensors, <br /> Did you confirm positive shut-down due to leaks and sensor failure/dIsconnaction7 L@ yes [j No <br /> Yos [-]No' NIA For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.,no mechanical <br /> overflil prevention valve is Installed),is the overfill warning alarm visible and audible at the tank fill polnts(s)and operating <br /> properly? If so,at what percent of tank capacity dmo the alarm trigger? y2_ <br /> n Yes- ®No Was any monitoring equipment replaced?If yes,IdentlPy specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replaemeatRarts In Section 17,below, <br /> r_1 Yes' Ir Exi,NO Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) []Product: <br /> 11 Water. If yes,describe causes in Section E,below, <br /> Yes n No- Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,If applicable. <br /> Yes r7 No Is all monitoring aquipment operational par manufacturers'specificatlons? <br /> In Section E below,describe,how and when these doficiances were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 Based on CA form dated 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.