My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. RETROFIT OR REPAIR . <br /> 1. Site map enclosed YES IV]( NO [ ] <br /> 2. Spec sheets attached for equipment to be installed YES NO [ ] <br /> 3. Description of work to be completed: Remove all Of the existing Veeder Root <br /> liquid sensors in the fill and turbine sumps and the UDC's <br /> and install new Veeder Root 794380-323 "Position Sensitive Sensors" <br /> sensors in their place. Once the sensors have been installed, we <br /> will perform necessary inspections and certify the new sensors. <br /> 4. Description of equipment to be used: <br /> (11 ) Veeder Root 794380-323 "Position Sensitive Sensors" <br /> See attached paperwork"There is 1 pipe sump" <br /> 5. All equipment is State certified or approved. YESZ NO [ ] <br /> 6. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES [ ] NO [ ] <br /> b. Identify contractor performing decontamination: <br /> Name Phone( ) <br /> Address City Zip <br /> C. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br /> Hauler Name Phone(_) <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.