Laserfiche WebLink
1 <br /> f I . <br /> 3. Pi in Leak Detection MonitorlAtquipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> Sump leak sensors connected to Veeder Root 794380-208 <br /> continuous monitoring system <br /> Specify type: Continuous <br /> Discriminating <br /> ®Non-discriminating <br /> Mechanical line leak detectors with Vapodess LD-2000 <br /> programmed leak threshold of three Every pumping cycle <br /> gallons per hour <br /> Electronic line leak detectors with <br /> programmed leak threshold of: Every pumping cycle <br /> 0.1 aph 0.2 aph 3 gPh <br /> Line integrity testing by: <br /> ❑Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing ❑ Other: <br /> ❑Third party testing <br /> ®Not required <br /> ❑Other(Specify): <br /> 4. Dispenser Leak Detection Monito ng Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> Mechanical float in dispenser Continuous <br /> containment <br /> Electronic leak sensor in dispenser Veeder Root 794380-208 <br /> containment: <br /> F1 Discriminating <br /> Continuous <br /> ®Non-discriminating <br /> ❑Visual inspection Visual inspection log maintained on site. Ll Daily <br /> ❑Other: <br /> No under-dispenser containment <br /> ❑Other(specify):Mechanical Float activates shear valve when leak detected. <br /> 6. Positive Shutdown Capabilities <br /> 9 System does not have positive shutdown capabilities <br /> Ll Individual dis nser shutdown will occur whenever release is sensed in under-dis nser containment <br /> Automatic pump shut off will occur whenever. <br /> ®Release is sensed in turbine sump <br /> ❑Release is sensed in primary piping <br /> ®Release is sensed at dispenser <br /> ®Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑Other(specify): <br /> 6.Secondary Containment Testing <br /> Seconda containment is not tested <br /> In the State of California,secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and eve 36 months thereafter. <br /> 7. Annual E ui ment Certification/Testing <br /> Annuals <br /> ❑Other(specify): <br /> 2 <br />