My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1390 Willow Pass Rd ., Suite 605, Concord, California 94520-7906 <br /> s Telephone: 925/691 -4444 Fax: 925/691 -4441 E-Mail: FFA@FFA.com <br /> DCA-(08728) <br /> October 16, 2003 <br /> San Joaquin County <br /> Environmental Health <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202-2708 <br /> Attn: John Jackson <br /> Subject: ARCO #2133, <br /> 2089 Benjamin Holt Drive <br /> Stockton, CA <br /> RE: Scope of work <br /> Mr. Jackson, <br /> Per your request,here is the scope of work for the above mentioned project: <br /> 1. Contractor to saw cut 6' x 6' minimum sections of existing tank slab at each manhole as shown. <br /> 2. Contractor to remove existing fill spill buckets. Remove existing drop tube flapper valve(if any) <br /> and any non-EVR ball floats. <br /> 3. Contractor to install new EVR riser adapters. <br /> 4. Contractor to install new 5 gallon spill containment buckets and manhole w/frame at each tank <br /> fill. EVR VR-102-B compliant. <br /> 5. Contractor to install new fill drop tube and ball floats at each tank. EVR VR-102-B compliant. <br /> 6. Contractor to install new riser components at existing tank gauge risers. Field verify exact riser <br /> location. EVR VR-102-B compliant. <br /> 7. Contractor to install new pressure vacuum vent valve as needed, at each gasoline vent riser. EVR <br /> VR-102-B compliant. <br /> 8. Contractor to patch all removed concrete to match existing. <br /> 9. Install new manway at existing annular riser. <br /> 10. Install new Veeder-Root overfill alarm w/acknowledgement switch and new automatic tank <br /> gauging if not existing. <br /> 11. Contractor to install new 42" sumps and Veeder-Root sensors at each tanks fill/vapor risers. <br /> Contractor to bond and seal sumps per manufactures specifications and SB989 compliance. <br /> Sensors located at lowest point in sump. <br /> Based on our prior conversation, once you receive this information,permits should be issued within 1-2 <br /> business days. If you have any questions, or need additional information please do not hesitate to contact <br /> me at (213) 448-3912 <br /> Very Truly Yours, <br /> Daniel C. Auten, II <br />
The URL can be used to link to this page
Your browser does not support the video tag.