My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Site Address: SS#2133,2908 Benjami olt Drive,Stockton Da Pof Testing/Servicing: Z=� .3 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Co lete the following checklist: <br /> s ❑ No* Is the audible alarm operational? <br /> s ❑ No* Is the visual alarm operational? <br /> s E] No* Were all sensors visuallyinspected,f inctionall tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes Cj Nd* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> /N/A operational? <br /> 04Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails too e_r�ate�is electrically disconne d? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ER Sump/Trench Sensors; ispenser Co mment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? es; ❑No. <br /> ❑ YesEZ/A <br /> For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at1-1 the tank <br /> fill poings)and operating ro rl ? If so,at what percent of tank capacity does the alarm trigger? ????% <br /> LYeo Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement arts in Section E,below. <br /> o Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) D <br /> Product; ❑Water. If es,describe causes in Section E,below. <br /> ❑ No* Was monitorin s stem set-u reviewed to ensure ro er settin s? <br /> ❑ No* Is all monitoring equipment oerational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: 2yAeDCL POTS i'3o7"11 apvr 7gy3ed-Za'9 s rvSo 2 s. <br /> Page 2 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.