My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e �� <br /> 10�„/ P E OAST PRODUCTS LLC <br /> MECHANICAL LEAK DETECTOR TEST DATA SHEET <br /> Station # a'1 Date 3/a-S/03 20 <br /> Address <br /> TEST INFORMATION <br /> 1 2 3 4 5 <br /> Product I I <br /> Manufacturer v IL <br /> Model Q l(® - p0 <br /> Full Operating Pressure (psi) 30 <br /> Line Bleed Back (ml) <br /> Trip Time (sec) ,v <br /> Metering Pressure (psi) 1 16 <br /> F/E Holding Pressure (psi) <br /> Test Leak Rate (ml/min) (gph) Ivi 13, 0 rig hl,{� <br /> PASS or FAIL '14S6 A551 <br /> Replaced All Failed Leak Detectors Yes No N/A <br /> If No, Replacement To Be Completed By (Date) <br /> This letter certifies that the annual leak detector tests were performed at the above referenced facility according to the <br /> equipment manufacturer's procedures and limitations and the results as listed are to my knowledge true and correct. <br /> The mechanical leak detector test pass/fail is determined using a low flow threshold trip rate of 3 gph at 10 PSI. <br /> Inspected By: Contractor l a6 t F—NUt(°t,1yy)*-r1q/ sV6- eems <br /> Technician rG�I HN2 Lic# <br /> Signature <br /> APC-3325 (9{02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.