Laserfiche WebLink
3. Piping Leak Detection Monitoring Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> •Sump leak sensors connected to Veeder Root 794380-208 <br /> continuous monitoring system <br /> Specify type: Continuous <br /> El Discriminating <br /> 10 Non-discriminating <br /> • Mechanical line leak detectors with Vaporless;/91 GRADE LD-2000 <br /> programmed leak threshold of three Every pumping cycle <br /> gallons per hour <br /> Electronic line leak detectors with Veeder Root PLLD/87 330022-416 <br /> programmed leak threshold of: Every pumping cycle <br /> El 0.1 gph E30.2 gph Z3 gph <br /> El Line integrity testing by: <br /> n Electronic line leak detector is <br /> equipped to conduct line tightness F1 Annually <br /> testing El Other: <br /> 0 Third Party testing <br /> ED Not required <br /> El Other(Specify): <br /> 4. Dispenser Leak Detection Monito ing Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> n Mechanical float in dispenser Continuous <br /> containment <br /> Z Electronic leak sensor in dispenser Veeder Root 794380-208 <br /> containment: Continuous <br /> El Discriminating <br /> 0 Non-discriminating El Daily <br /> El Visual inspection Visual inspection log maintained on site. El Other: <br /> ❑ No unde dispenser containment <br /> ❑Other(specify): Mechanical Float activates shear valve when leak detected. <br /> 6. Positive Shutdown Capabilities <br /> El System does not have positive shutdown capabilities <br /> —aIndividual dispenser shutdown will occur whenever release is sensed in under-dispenser containment <br /> Automatic pump shut off will occur whenever: <br /> Z Release is sensed in turbine sump <br /> F1 Release is sensed in primary piping <br /> Z Release is sensed at dispenser <br /> Z Monitoring system is disconnected or fails in any way(fail safe) <br /> El Other(specify): <br /> 6.Secondary Containment Testing <br /> El Secondary containment is not tested <br /> In the State of California,secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and every 36 months thereafter. <br /> 7. Annual Equipment Certification/Testing <br /> FKA::nnually <br /> El Other(specify): <br /> 2 <br />