My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Publication No.: DXPI200 <br /> Effective Date: 09-17-95 <br /> S EIR I NE bAft D I NS mr Em N S stm R UMN Supersedes: NEW <br /> U00% aamms <br /> IN055hUALLATION2 IN!"i"INGTIUN <br /> mill <br /> GENERAL ASSEMBLY <br /> Step Two <br /> h Mount stabilizer bar into <br /> r_ unistruts. <br /> .� <br /> � Step Three <br /> Imp® — Attach the shear valve <br /> Pan installation requires the use of boss-mount shear <br /> a bracket to the stabilizer bar <br /> valves and 1-1/2"male flex connectors.Total using the hardware provided. <br /> Containment Flex Jackets can be used to isolate flex Adjust the height of the <br /> connectors in this application. bracket so that the shear <br /> section of the shear valve is <br /> even with the top of the <br /> PRE-INSRLLMON frame. <br /> Step one—Installing Was <br /> Before installing dispenser <br /> pan,layout and measure for For Presssure and Suction Systems <br /> -� appropriate drill locations. [Anchoring) <br /> Refer to dispenser footprint Step One_ <br /> for location of product, <br /> vapor,and conduit entries. Put dispenser anchor bolts <br /> through holes located on <br /> For further directions,please refer to the Bulkhead frame.Be sure threaded part <br /> Fitting Installation Instructions BFI726,that are <br /> _ g � is above frame as shown in <br /> supplied with the bulkhead fittings. photograph.Put a washer <br /> ® ` ; and a nut above and below <br /> Step T —Installing Pan Boot the frame.Adjust the frame <br /> Install`pan entry boot as per anchor bolts to point <br /> instructions on the template downwards as illustrated in <br /> 4' providedwith the pan entry the photograph. <br /> i boot. Refer to dispenser <br /> ® manufacturer for <br /> recommended anchoring <br /> \, instructions. <br /> wA. <br /> / <br /> For Pressure Svstems <br /> Step One �quesln � the <br /> Install shear valve mountingIfila�1 511& <br /> .� plate to boss of shear valvean °�tSt4t11@I <br /> using the three fasteners �gy� � 77. <br /> / <br /> provided. y <br />
The URL can be used to link to this page
Your browser does not support the video tag.