My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:56:42 AM
Creation date
6/3/2020 9:44:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V 'A �& 0 tonitor Certification Inspection <br />Vr ARCO Products Company <br />This letter certifies that the monitor(s) is/are in place, the probes are in correct position and the system <br />is operating properly. 19 <br />Station # Date _ <br />Address _�' ^o' �'"" ©� Type In!a— <br />o Annual Permit <br />Recheck Leak <br />Type & Model of Monitor <br />System Function <br />Tanks Annular Space In Tank <br />l;a�s Fail N/A Pass Fail / <br />Regular �— <br />Midgrade <br />Supreme <br />Waste Oil <br />Other -7 <br />Product Lines Turbine Sump In -Line Fill Sump <br />P Fail N/A Pass Fail N/ Pass Fail N/ <br />Regular — <br />Midgrade <br />Supreme <br />Waste Oil �� <br />Other <br />When monitor is turned off or in alarm, is there positive shutdown pf turbines? Yes No <br />If No, were precision product line tests performed? Yes No <br />Monitor Panel <br />Is the monitor panel mounted and labeled correctly? <br />Does monitor alarm horn function properly? <br />VC „ <br />Is panel accessible and visible to station personnel? <br />Replaced all failed probes? Yes <br />No N/A <br />If No, probes to be replaced/repaired by (Date) <br />TO i -S <br />C �`F 4- 5cl tlt/ <br />Inspected By: Contractor L lo— <br />Technician <br />Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.