Laserfiche WebLink
UWRED PROGRAM CONSOLIDATED FORM TANK: TA0102101 <br /> PR#: PR0231021 <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 1 FAC#: FA0003625 <br /> VIX _731slo;� (AL <br /> (two pages per tank) <br /> Page 2 of 9 <br /> TYPE OF ACTION ❑ I NEW SITE PERMIT ❑ 4 AMENDED PERMIT 5 CHANGE OF INFORMATION ❑ 6 TEMPORARY SITE CLOSURE <br /> (Check only item only) <br /> f I ❑ 7 PERMANENTLY CLOSED ON SITE <br /> 10M <br /> ❑ 3 RENEWAL PERMIT ❑8 TANK REMOVED 430 <br /> BTj -M <br /> USINESS NAME(Sarno as FACILITY NAME or DBA-Doing Business As) FACILITY ID: PR#: 1 <br /> ARCO STATION#2133* 3 FA0003625 PR0231021 <br /> LOCATION WITHIN SITE(optionai) 2908 W BENJAMIN HOLT DR,STOCKTON 431 <br /> PHONE <br /> I.TANK DESCRIPTION(A scaled plot plan with the location of the UST system including buildings and landmarks shall be submitted to the local agency.) <br /> TANK ID# Tank#: 1 432 TANK MANUFACTURER 433 COMPARTMENTALIZED TANK ❑Yes ❑No 434 <br /> TA0102101 MODERN WELDING If"Yes",complete one page for each compartment. <br /> DATE INSTALLED(YEAR/MO) 435 TANK CAPACITY IN GALLONS 436 NUMBER OF COMPARTMENTS 437 <br /> 4/1/1984 12,000 <br /> ADDITIONAL DESCRIPTION(For local ase only) 438 <br /> 3/06/00 CHNG PE FR 2315 TO 2360 PER MK.LBR <br /> II.TANK CONTENTS <br /> TANK USE 439 PETROLEUM TYPE 440 <br /> ® 1.MOTOR VEHICLE FUEL ® la.REGULAR UNLEADED ❑ 2.LEADED ❑ 5.JET FUEL <br /> (If marked complete Petrolemn Type) <br /> ❑ lb.PREMIUM UNLEADED ❑ 3.DIESEL ❑ 6.AVIATION FUEL <br /> ❑ 2.NON-FUEL PETROLEUM ❑ It;.MIDGRADE UNLEADED ❑4.GASOHOL ❑ 99.OTHER <br /> ❑ 3.CHEMICAL PRODUCT COMMON NAME Cram Hazardous Materials Invent page) CAS# from Hazardous Materials Invent page) <br /> ❑ 4.HAZARDOUS WASTE ( Inventory 8 teal ( p g ) 4a2 <br /> (Includes Used Oil) <br /> ❑ 95.UNKNOWN <br /> HI.TANK CONSTRUCTION <br /> TYPE OF TANK ❑ 1.SINGLE WALL ❑ 3.SINGLE WALL WITH ❑ 5.SINGLE WALL WITH INTERNAL BLADDER SYSTEM 443 <br /> (Check one item only) EXTERIOR MEMBRANE LINER ❑ 95.UNKNOWN <br /> ® 2.DOUBLE WALL ❑ 4.SINGLE WALL IN VAULT ❑ 99.OTHER <br /> TANK MATERIAL-primary tank ❑ 1.BARE STEEL .W FIBERGLASS/PLASTIC ❑ 5.CONCRETE ❑95.UNKNOWN 444 <br /> (Check one,itcm only) ❑2.STAINLESS STEEL ISYSTEEL CLAD W/FIBERGLASS ❑ 8.FRP COMPTIBLE W/100%METHANOL <br /> REINFORCED PLASTIC(FRP) <br /> ❑ 99.OTHER <br /> TANK MATERIAL-secondary tank ❑ I.BARE STEEL X.FIBERGLASS/PLASTIC ❑ 5.CONCRETE ❑95.UNKNOWN 445 <br /> (Check one item only) ❑ 2.STAINLESS STEEL ❑ 4.STEEL CLAD W/FIBERGLASS ❑ 8.FRP COMPTIBLE W/100%METHANOL <br /> REINFORCED PLASTIC(FRP) ❑ 10.COATED STEEL ❑ 99.OTHER <br /> ❑ 5.CONCRETE <br /> TANK INTERIOR LINING ❑ 1.RUBBER LINED ❑ 3.EPDXY LINING ❑ 5.GLASS LINING ❑95.UNKNOWN 446 DATE INSTALLED 447 <br /> OR COATING <br /> (Check one item only) ❑ 2 ALKYD LINING ❑4 PHENOLIC LINING ® 6 UNLINED ❑ 99.OTHER <br /> (For local use only) <br /> OTHER CORROSION ❑ 1 MANUFACTURING CATHODIC ® 3 FIBERGLASS REINFORCED PLASTIC ❑ 95 UNKNOWN 448 DATE INSTALLED 449 <br /> PROTECTION IF APPLICABLE PROTECTION <br /> (Check ort-item only) ❑ 4 IMPRESSED CURRENT E] 99 OTHER <br /> ❑ 2 SACRIFICIAL ANODE (For local use only) <br /> SPILL AND OVERFILL YEAR[NSTALLE450 TYPE(local use only) 451 OVERFILL PROTECTION EQUIPMENT:YEAR INSTALLED 452 <br /> (Check all that apply)O. 4 SPILL CONTAINMENT ❑ I ALARM [2(3-FILL TUBE SHUT OFF VAL' <br /> ❑ 2 DROP TUBE ❑ 2 BALL ❑4 EXEMPT <br /> ❑ 3 STRIKER PLATE FLOAT <br /> IV.TANK.LEAK DETECTION(A description of the monitoring program shall be submitted to the local agency.) <br /> IF SINGLE WALL TANK(Check all that apply) 453 IF DOUBLE WALL TANK OR TANK WITH BLADDER 454 <br /> ❑ I VISUAL(EXPOSED PORTION ONLY) ❑ 5 MANUAL TANK GAUGING(MTG) (Check one item only) <br /> ❑ 2 AUTOMATIC TANK GAUGING(ATG) ❑ 6 VADOSE ZONE ❑ I VISUAL(SINGLE WALL IN VAULT ONLY) <br /> ❑ 3 CONTINUOUS ATG ❑ 7 GROUNDWATER ®2 CONTINUOUS INTERSTITIAL MONITORING <br /> ❑4 STATISTICAL INVENTORY RECONCILIATION ❑ 8 TANK TESTING ❑3 MANUAL MONITORING <br /> (SIR)BIENNIAL TANK TESTING ❑ 99 OTHER <br /> V.TANK CLOSURE INFORMATION/PERMANENT CLOSURE IN PLACE <br /> ESTIMATED DATE LAST USED(YR/MO/DAY) 455 ESTIMATED QUANTITY OF SUBSTANCE REMAINING 456 TANK FILLED WITH INERT MATERIAL? 457 <br /> ❑Yes ❑No <br /> UPCF(12/99 revised) <br />