Laserfiche WebLink
Health&safety'1'raming ,t-9.1.P.vw.,e., asa!woaw ww@w�rw -q—q—".��g <br /> .Suns pmpe—.l-rwvgwm oq^9U^MM <br /> Certificate of Completion 5201—S plotd'aase-W <br /> E 9s 8-Hour HazWOpER Refresher AcnadAP-Ii — <br /> Jason Audiss has successfully completed the 8- s>,npad ruawmewoo kepuoaas pue kwUlud Palin-Mio uollepelsm oql <br /> Hour HazWOpER Refresher Health&Safety ao;mersord uonelt-uI Ausno luloi.LSVOxUfi1d RLIKS aql m gpcg las se sulmen <br /> Training Course,satisfying the OSHA lapuoq palatdiuoa,(itn;ssaoons SSICUV bNY17 Z0/91/60 no IEgl/4luoo 01111 silty <br /> Hazardous Waste Operations and Emergency <br /> Response Standard 29 CFR 1910.120(e)(8), 0NIAUW.L xaaNOa <br /> (c)(8)and Cal/OSHA 8 CCR 5192(e)(q). " <br /> trued-0—aA V I <br /> Date:07/31/2004 Instructor:Brent D.Penner <br /> OSHA Comoliance Trainer FUAM <br /> C � <br /> bpJason Audiss,Wayne Perry <br /> � Na+'ruccersfulry corrryreleQ't-ming in rhe fol6wmg; 4: If <br /> M Boudreau Electric 522T/RMS Series Monitoring System Training— <br /> Installation,Maintenance and Testing <br /> ® eau <br /> Bdreau Electric 500 Series Monitoring System Training—Installs <br /> tara+o tion,Maintenance and Testing <br /> ® Beaudreau Electric 400 Series Leak Detection System Training-instal <br /> 0 lotion,Maintenance and Testing <br /> NOnW! Jason Audiss <br /> 13BEI SystemOne Vacuum Monitoring System,Double Wall Components ' <br /> Company: Wayne P !, nQ- —Installation,Maintenance and Testing <br /> ry � ❑ BoudreauElectric E-SITE System Training—Installation,Mainteance <br /> CCF s �1I.0 &Testing <br /> axpbvw-A <br /> .i <br /> Certificate of Participation <br /> Mr.Jason Audis. SOW U"W <br /> i Wayne Perry Inc. <br /> FE Pelro Technical Training Seminar - - <br /> i <br /> FE PETRa <br /> F—klin Fueling auyseems <br /> 8/282005 <br /> i,Nrwloe.GgMw <br /> Ism <br /> Attestation No. P 02772 <br /> Jason Audiss Jason Audiss,Wayne Perry,Ine <br /> Wayne Perry Inc. Na<„rcces>fF,c9,n,,(Bre6Mat>aug U.rFefermwrug: <br /> Attended Installation Training for EVR Phase I by OPW,Inc. ❑ neaudreauElectric522T/RMSSeriesMonitoringSystemTraining— <br /> Imannation,Maintenance and Testing <br /> By David Haas On 5/18/2005 ❑ Beandrou Eledrie 500 Series Monitoring System Training— <br /> Inataaatio s,Maintenance and Testing <br /> I n Sacramento. CA Exp Date: 5/18/2007 ❑ Boudreau Electric 400 Se i"Leak Detection System Training— <br /> Installation,Maintenance and Testing <br /> Completion of this training course does not create a warranty or guaranty by OPW of ® BEI Systemo ne Vacuum Monitoring System,Double Wali Components <br /> your installation and/or main ter of nozzles,vapor recovery systems and EVR —Installation <br /> PHASE I systems. This training o .7e$not eliminate the need to strictly adhere to ❑ Beaudreau Electric E-SITE System Tr Installation, <br /> manufacturer instructions and p..__aures when installing and maintaining nozzles, Maintenance&Testing <br /> vapor recovery systems and EVR PHASE I Systems. Al/nozzles,vapor recovery systems <br /> and FVP PHA CF r'Z—t—c muct hu lnahll—i—i r.. --A - <br />