Laserfiche WebLink
Work Order: 2255439 <br /> by <br /> Emergency Stop (E-Stop) Testing Results & Checklist <br /> Site a ZCo.Name: i K�Is Date R 2 <br /> Address Z i a �.1 Pftaria. <br /> Ci t St: S'rac�t+�. C/3 Le T `icfan: PASS <br /> eMaint.WWI! Name: d4 �� or <br /> s' Si nature: �✓ FAIL Next Day Repair Required) <br /> The abieclivu of this test Is to provide assurarice that the when she estop switch is ar3tratrd,all the fueling syslrm circuits tbai bines,and dispensers)ars d <br /> jj <br /> energized,and remain ds-aetergfzed until they era,+a-sst rnatualiyi. The test procedwas AM pulderinas their be in acarynce with the E-3top Teeting Process. <br /> # The rauowft trt►vrroaftil is to be compfeeeet xTosa <br /> Yae A <br /> 1 Number of E-Stop switches: 2r <br /> 2 Type of Switch? _Push Pull `Momentary Plain light I Toggle Other: <br /> (if Momentary type,locate and identify re-set button): <br /> 3 Type of Turbine Contra?Relay System(Electrical Distribution Center): <br /> Brown Bax _Power SolutionOtltier Custom Fabricated <br /> 4 Type of Turbine Control Relays- Makes ^ ,. Model <br /> 5 Type of Line Leak Detection: MechanicaJ ELDICPT PLLD <br /> V1 111MIM11 1111101 <br /> 6 008s the E-Stop shutdown power to the DISPENSERS <br /> 7 Does the E-Stop shutdown power to the TURBINES r <br /> 8 Is the 220 voltage to the turbine relay removed(both sides of the relay) y <br /> 9 Are the TURBINE BREAKERS clearly identified 1 labeled <br /> -V Did the E-Stops)function correctly(d"nergized from both sides of the relay) <br /> 10A If#to is NO,briefly describe what was wraig_ <br /> 10B Now was it corrected: <br /> 10C If repair or E-Stop functionality can not be corrected same day(prior to tsaving the site). The technician MUST notified <br /> the Site Manager of the problem,place an"Out of Service"Tag on the E-Stop(s),and identified an alternate mean for <br /> site shutdown in the event of an emergency. <br /> 10D The Elite Customer Solution Center has been contacted for the repair. <br /> W.O-Ticket fr <br /> 11 Site's fueling system IS fully operational, <br /> 12 All equipment secured and any access ports,lids,enclosures are closed. <br /> 13 All safety barricades,and any debris was been removed, <br /> I - <br /> Tanknology Inc. 8501 N.MoPac Expressway,Suite 400,Austin,Texas 78759 <br />