Laserfiche WebLink
4 FIED PROGRAM CONSOLIDATED F <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - jPale I of 3 <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> Check oneitem only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2a. <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) ARCO 02133 3 <br /> BUSINESS SITE ADDRESS 2908 BENJAMIN HOLT DR 103 BusINEss SITE CITY STOCKTON 104 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> b the equipment manufacturers'instructions,or.annually,,whichever is more frequent.Such work must be performed by qualified personnel[23 CCR§2632,2634,2638,2641] <br /> ....._y........ ............................................................... ....................... .................................... ..... .. ........ .9................................................ <br /> 490-3a. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY 99.OTHER(Specify): <br /> a90-3b. <br /> IIL 1trIONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490-4. <br /> IV. TANKMONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) thatheck apply)11 <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 794390-420 490-10. <br /> .................................................................................................................................................................I.............. ......................__...............-............................................. <br /> ❑ 2,AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26433 <br /> 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490.13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci ago-18. <br /> ..............................._............_.............................._..........._.................................................................._g11,1.-................................................................_g:p:........................................................................................_......p.........�'�....... .........a.....I............. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.q 490-20. <br /> ................................................................._................................................................................................................................................................................................................................................._...............__................................................................................................................................................................................................................................................. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 z1 <br /> ....................................................................................................................................................................................................-..................................................................................................................................... <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24. <br /> ..........................................-................................._Q................................................................................................................................................................................................................................................................................................_.... ..............:...... ..........490-25:............ <br /> ❑ 99.OTHER(Specify): ago-zb. <br /> 490-27. <br /> V. PIPE MONITORING I PERFORMED USING THE FOLLOWING METHOD(S) tecl apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> §2636] <br /> PANEL MANUFACTURER:Veeder Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(s): 794380-323 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34, <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> . ..................................................................................................................................................................................................................................................................................................................................................................... <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636] <br /> MLLD MANUFACTURER(S):V1 orle8S 91 tank onl 490-37. MODEL#(S): LD2000 91 tank on) 490-38. <br /> ......................................._..........-.............................................................................................1 ........................................................................................ ........................... <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39, <br /> ELLD MANUFACTURER(S):Veeder Root 490-40. MODEL#(S): PLLD 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑ b.NO 49044. <br /> .......................................................................................................................................................-......................._.................................................................................................................................................................I.................... <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45, <br /> TEST FREQUENCY: Ela.ANNUALLY ❑ b.EVERY 3 YEARS [3c.OTHER�_p � 490-47. <br /> S eci ago-46. <br /> _Q..............................................................._._....... ................................................................................................................................................................................................................................................................................................................._... ......... ..... ...... ......... <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED. 490-49. <br /> .'.Allowed.for.monitoring.of unburied,emer�ency.penerator,fuel piping,only Per,HSC_§25281,5(b)(3� <br /> .. ...................---._._........................_.... ......_._............................................I. ............ .... .................... ......... 490 50. <br /> 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)] <br /> tF <br /> ..............................................................................._.__.........._.......................................-........................................................................................................................................................................_................................................................................................................................................................................................................................................... <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> .............................._..............._.................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... <br /> 99.OTHER(Specify) 490-52. <br /> 490-53. <br /> ♦___nnso� n.,�_�___r____.._�__...�o____,.__ n..__1 ..6� a*_:a,.-_r.rr__.a_._n.nnmo <br />