My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:10:36 PM
Creation date
6/3/2020 9:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2007
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2006-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> SWRCB. Januar% 100' 11a,-)c 2 . <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> f=acility is Not Fquipped With Spill/Overfill Containment [loses: El <br /> Spill/Overfill Containment Boxes arc Present. but were Not Tested: <br /> Fest Method Dc\eloped By: F-1 Spill Bucket Manufacturer Fx1 Industry Standard Professional I'llgineer <br /> Other(Specify) <br /> Fest Method Used: Pressure Vacuumf lydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> ,KNA' I A-- � '"� Spill Box# 1 REG FILL Spill Box# 2 REG FILL Spill Box# 3 PRE FILL Spill Box# <br /> Bucket Diameter: 10 1/211 10 1/2" 10 1/2" <br /> Bucket Depth: 1411 1411 1411 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN. 5 MIN. 5 MIN. <br /> starting test: <br /> Test Start Time: 1:15 1:15 1:15 <br /> Initial Reading(R( ): <br /> 13" 13" 13" <br /> Test End Time: 2 :2 0 2 :2 0 2:2 0 <br /> Final Reading(RI.- ): <br /> 13" 13" 13" <br /> Test Duration: 60 MIN. 60 MIN. 60 MIN. <br /> Change in Reading(R F-Ri ) <br /> oil Oil Oil <br /> Pass/Fail Threshold or PASS PASS PASS <br /> Criteria: <br /> Test Result. " 0 Passr�.: Pass Fa<I Pass Fain ;,I',ass EI Fail: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> OPW SPILL BUCKETS ON SITE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.