Laserfiche WebLink
e <br /> SWRCB. Januar% 100' 11a,-)c 2 . <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> f=acility is Not Fquipped With Spill/Overfill Containment [loses: El <br /> Spill/Overfill Containment Boxes arc Present. but were Not Tested: <br /> Fest Method Dc\eloped By: F-1 Spill Bucket Manufacturer Fx1 Industry Standard Professional I'llgineer <br /> Other(Specify) <br /> Fest Method Used: Pressure Vacuumf lydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> ,KNA' I A-- � '"� Spill Box# 1 REG FILL Spill Box# 2 REG FILL Spill Box# 3 PRE FILL Spill Box# <br /> Bucket Diameter: 10 1/211 10 1/2" 10 1/2" <br /> Bucket Depth: 1411 1411 1411 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN. 5 MIN. 5 MIN. <br /> starting test: <br /> Test Start Time: 1:15 1:15 1:15 <br /> Initial Reading(R( ): <br /> 13" 13" 13" <br /> Test End Time: 2 :2 0 2 :2 0 2:2 0 <br /> Final Reading(RI.- ): <br /> 13" 13" 13" <br /> Test Duration: 60 MIN. 60 MIN. 60 MIN. <br /> Change in Reading(R F-Ri ) <br /> oil Oil Oil <br /> Pass/Fail Threshold or PASS PASS PASS <br /> Criteria: <br /> Test Result. " 0 Passr�.: Pass Fa<I Pass Fain ;,I',ass EI Fail: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> OPW SPILL BUCKETS ON SITE. <br />