Laserfiche WebLink
SWRCB,January 2002 9 Page 2. <br /> 9. SPILL/OVERFELL CONTAUNaIENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: E] <br /> Test Method Developed By: El Spill Bucket Manufacturer 1XI Industry Standard ❑ Professional Engineer <br /> F] Other(Specify) <br /> Test Method Used: F] Pressure El Vacuum Hydrostatic <br /> F] Other(Specify) <br /> Test Equipment Used: MEN= Equipment Resolution: <br /> Spill Box# 1 8 7 S Spill Box# 2 8 7 M Spin Box# 91 Spill Box# <br /> Bucket Diameter: 10.75 10.75 10.75 <br /> 10 <br /> Bucket Depth: 10 10 777 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 <br /> starting test: <br /> Test Start Time: 0829 0829 0829 <br /> Initial Reading(Rt 711 7" 711 <br /> Test End Time: 0929 0929 0929 <br /> Final Reading(RF 7 H 711 711 <br /> Test Duration: 60 60 60 <br /> Change in Reading(R F R4 ) 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Poss 'AAR <br /> "M tas$L "Pail <br /> FOR —j pan 0]�**C] <br /> Test Result. <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />