My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Facility Name: Arco #2133 (Page 3) <br /> In-Tank Gauging: <br /> ®Check this box if tank gauging is used only for inventory control. <br /> Complete the fol owing checklist: <br /> ®Yes El No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> ®Yes ❑No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑ No* Was accuracy of system product level readings tested? <br /> Les ❑ No* Was accuracy of system water level readings tested? <br /> ❑ No* Were aIB probes reinstalled properly? <br /> ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> ®Yes ❑No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> ❑N/A performance? (Check all that apply) Simulated leak rate: ® 3 gph.; ❑ 0.1 gph ; ❑ 0.2 <br /> h. <br /> ®Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ®Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ®Yes F No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑N/A is disabled or disconnected? <br /> ®Yes No* For electronic LLDs,does the turbine automatically shpt off if anyportion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ®Yes ❑ No* For electronic LLDs, have all aceessiksle wiring connections been visirally inspected? <br /> ❑ N/A <br /> Yes No* Were all items on the equipment rnatsufiaci6rer' ai�tenance checklist completed? <br /> *In the Section H, below, describe how and when these deficienci s wwere ill be corrkt*tl. <br /> H. Comments: The 91 LLD needed to be adjusted 3 times. It passed after the third" <br /> adjustment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.