Laserfiche WebLink
0 0 <br /> Facility Name: Arco #2133 (Page 3) <br /> In-Tank Gauging: <br /> ®Check this box if tank gauging is used only for inventory control. <br /> Complete the fol owing checklist: <br /> ®Yes El No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> ®Yes ❑No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑ No* Was accuracy of system product level readings tested? <br /> Les ❑ No* Was accuracy of system water level readings tested? <br /> ❑ No* Were aIB probes reinstalled properly? <br /> ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> ®Yes ❑No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> ❑N/A performance? (Check all that apply) Simulated leak rate: ® 3 gph.; ❑ 0.1 gph ; ❑ 0.2 <br /> h. <br /> ®Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ®Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ®Yes F No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑N/A is disabled or disconnected? <br /> ®Yes No* For electronic LLDs,does the turbine automatically shpt off if anyportion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ®Yes ❑ No* For electronic LLDs, have all aceessiksle wiring connections been visirally inspected? <br /> ❑ N/A <br /> Yes No* Were all items on the equipment rnatsufiaci6rer' ai�tenance checklist completed? <br /> *In the Section H, below, describe how and when these deficienci s wwere ill be corrkt*tl. <br /> H. Comments: The 91 LLD needed to be adjusted 3 times. It passed after the third" <br /> adjustment. <br />