Laserfiche WebLink
0 <br /> P.O.Box 4208 <br /> Sonora CA 95370 <br /> AT Ca:623541 A-Haz <br /> A lite ch Pe tr -6 Phone:209-532-7320 <br /> Compliance without Compromise Fax:209-533-2650 <br /> mail@alltechpetro.com <br /> www.alitechpetro.com <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and printouts from <br /> tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Arco 2133 Date of Testing: Wednesday,January 23,2013 <br /> Facility Address: 2908 Benjamin Holt Dr. Stockton,CA 95207 <br /> Facility Contact: Laurence Phone: 209-478-5552 <br /> Date Local Agency Was Notified of Testing: 12/20/12 <br /> Name of Local Agency Inspector(if present during testing): Jeff Wong <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Alltech Petro Inc, P.O.Box 4208,Sonora CA 95370.(209)532-7320 <br /> Technician Conducting Test: Chad White <br /> Credentials': ®CSLB Contractor ® ICC Service Tech. ®SWRCB Tank Tester ❑Other(Specify) <br /> License Number(s): CA:623541 A-Haz ICC 8152115-UT SWRCB 09-1747 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ® Hydrostatic ❑vacuum ❑Other <br /> Test Equipment Used: One Hour observed test Equipment Resolution: 1/16' <br /> Identify Spill Bucket(By Tank 1 87 Master Vapor 2 87 Slave Vapor 3 91 Vapor 4 <br /> Number,Stored Product,etc.) <br /> Bucket Installation Type: <br /> El Direct Bury pir t,Bury... ❑Direct Bury El Direct Bury <br /> ®In Sum <br /> ®In' tt►i tnSu" ❑In Sum <br /> Wait time between applying <br /> vacuum/water and start of 0 <br /> test: <br /> Test Start Time(T): 10:20 10:20 10:20 . <br /> Initial Reading(R,): 2"above cap 2 1/4"above cap 2 3/4"above cap <br /> Test End Time(TF): 11:20 11:20 11:20 <br /> Final Reading(RF): 2"above cap 2 1/4"above cap 2 3/4"above cap <br /> Test Duration(TF—T,): 1.0 hr 1.0 hr 1.0 hr <br /> Change in Reading(RF-R,): 0.0 0.0 0.0 <br /> Pass/Fail Threshold or Criteria: 1/16' 1/16" 1�'F6", , <br /> TesfiEtes+r ,�... � ;as �!� : �► " '�>� .�'. `r�s�.F .❑��.; �"" �Fait:. <br /> Comments— (include information on repairs made prior to test"I dre,ommended f6fidw-up.fdr'6iled` <br /> tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR it,DUCTMIG THIS TESTING <br /> I hereby certify that all the information contained in this repotx:u-true,accurate,and in full compliance with kgaf requitefneeaf3. <br /> Technician's Signature: ��/ Date:1/23/13 <br />