Laserfiche WebLink
0 0 <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sogov.org/ehd <br /> UNDERGROUND STORAGE TANK(UST) PROGRAM INSPECTION REPORT <br /> Facility Inspection <br /> Name: _TAddress. Date: <br /> Facility ARCO Station #2133 2908 W. Ben Holt, Stockton Jan 23, 2013 <br /> Facility Title <br /> Contact: Kristina Altheide cashier ft-8552 <br /> Inspection <br /> Type: XRoutine X Monitoring System Certification E Installation o Complaint-ID#: 0 Other: <br /> (Authority HSC 25289) <br /> Consent for: Xinspection OSampling XPhotos Granted by:Lawrence Wight Title: Tank Operator <br /> Monitoring Piping Overfill <br /> Panel. Veeder-Root TLS-350 Pressurized Ll Suction 11 Gravity [I Mechanical XAudible/visual <br /> System: Prevention. <br /> UST <br /> 1 ------ --87-octane-2-—- --------7 --------------- <br /> --91-octane -------------- - - - - - - - - <br /> -- <br /> Product 87-octane I 91-octane <br /> Designated ]CC Exp. <br /> Operator: Michael Holkko Date: 1/10/14 Violations: OM1-Release Detection 11 M2-Release Prevention [IM3-Both <br /> 0 On Site Service ICC Exp.6/22/14 Manufacturer's <br /> .Site <br /> Date: Training: <br /> Technician: Chad White VR Lv14 8/21/2012; VMI #2125 3/16/2013] <br /> VIOLATIONS <br /> # C1 C2 M Code Section HSC=California Health and Safety Code;CCR=California Code of Regulations <br /> C1=Class 1 violation;C2=Class 2 violation;M=Minor violation <br /> IMIEMN F1 <br /> 101 HSC 25284 No permit to operate <br /> 102 HSC 25404.5 Annual operating fees not paid <br /> 103 HSC 25284(a)(3) No written agreement between the person that the operating permit was issued to and the tank operator to <br /> monitor the tanks stem <br /> 104 HSC 25292.2 Current financial responsibility documents not on file with the Environmental Health Department(EHD) <br /> 105 CCR 2711 Current Unified Program Consolidated Forms not on file with the EHD(Facility and tank form) <br /> 106 CCR 2632(b) Monitoring Program(Monitoring&Response Plans)is not current or approved by the EHD <br /> 107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or fails to completely show where monitoring is performed <br /> 108 CCR 2637 Secondary containment:(a)test not performed;(e)test report not submitted within 30 days;(0 test notification <br /> notprovide to the EHD at least 48 hours prior to conducting the test <br /> Monitoring equipment certification:(a)not performed annually;(d)test report not submitted within 30 days; <br /> 109 CCR 2638 (e)test notification not provided to the EHD at least 48 hours prior to conducting an installation,repair, <br /> replacemen,calibration,or certification <br /> 110 HSC 25291(f) Annual line leak detector test not performed (Mi) <br /> ill HSC 25284.2 Annual spill containment testing not performed <br /> 112 CCR 2636(f)(4) Annual line tightness test not performed if positive shutdown or fail safe not present (Mi) <br /> 113 CCR 2715(a) Failed to inform the EHD of a change of designated operator within 30 days <br /> 114 CCR 2715(b) Designated operator does not possess a current ICC;CA UST System Operator certification <br /> 115 CCR 2660(k) Repair for tank or piping not tested for tightness after completion of the repair pursuant to (M2) <br /> permit conditions <br /> 116 HSC 25292.5 Enhanced leak detection(ELD)testing not performed on a system located within 1000'of public well,or <br /> failures not repaired and retested <br /> 117 CCR 2661 Permit to repair UST system not obtained <br /> 118 HSC 25286(a) Operational permit not amended when UST storage and/or monitoring system changed <br /> 119 HSC 25298(b) Permit to temporarily close LIST system not obtained <br /> 120 HSC 25298(c) Permit to close UST system not obtained <br /> MEMMM MEEM <br /> Maintenance&monitoring records not maintained 3 years,cathodic protection records for 6%years,written <br /> performance claims pertaining to release detection systems for 5 years,or records of repairs,linings,and <br /> 201 CCR 2712(b) upgrades for the life of the tank. Monitoring records include:(1)date and time of all monitoring or sampling; <br /> (2)monitoring equipment calibration and maintenance records;(3)results of any visual observations;(4) <br /> results of sample analysis performed a lab or in the field;(5)logs of all readings of gauges or other monitoring <br /> equipment,ground water elevations,or other test results;(6)results of inventory readings and reconciliations <br /> 02 CCR 2712(i) Monitoring plan,response plan,and/or operating permit and all conditions not onsite <br /> Unauthorized release that: (c)did not escape secondary containment and cleaned up within eight hours (Ml) <br /> 0 <br /> L23 CCR 2650 was not recorded;(e)escaped secondary containment,not cleaned up after eight hours,or a sudden loss of <br /> product was not reported to the EHD within 24 hours <br /> Inspector. Received By, 3&/Zoa Title: <br /> Jeffrey Wong (209) 468-0335 M 1 4 0 OL;) <br /> � <br /> EHD 23-02 Rev 04/19/12 Page 1 UST INSPECTION REPORT <br />