Laserfiche WebLink
PIPING LEGEND CLIENT: <br /> EXISTING 2" `.G. r)OUBLE WAIL PRODUCT PIPING,, <br /> NV EXIr:TING 2" OR 3" F.G. SINGLE v'v'M..L V iPOR RECOVERY PIPING <br /> SINGLE 'JV ALL `vENT PIPING <br /> EXISTING 2" F.G <br /> GENERAL____a_.._ ____._.__. <br /> -- N-OTE-S <br /> TRU TION IS EXISTING AND TO FLEMAIN UNLESS NOTED OTHERAIISE, <br /> ALL CONS <br /> C <br /> ------ ARCO <br /> -THE CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD bP WEST COAST PRODUCTS,LLC <br /> FINISHES IN PLACE. -0 <br /> SECONDARY CONTAINMENT P I R ING IS SHO!VN BY NOTE ONLY, NOT GRAPHICALLY, ALL EXISTING PRODUCT 7L[F�NEE �ANACER7­ACF7N <br /> IDI PING IS DOUBLE CONTAINMENT PIPE. VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL PIPE. <br /> EVR PHASE 11 AND ISD UPGRADE INSTALLATION NOTES <br /> 0 <br /> 0 <br /> CD EXISTING (3) 12,I_00 CALLON DOUBLE W'ALL TANKS AND PIPING SYSTEMS TO REMAIN, THERE SH/311 BE NO WORK <br /> a. <br /> A F ART OF THIS SCOPE. <br /> PERFORMED ON ANY BURIED PIPING 46 A <br /> NOT USED <br /> < DE <br /> L-U <br /> N EAv/ 1 VEN T TIE IN <br /> EXISFING (4) GIL.BARCO 378 DISPENSERS 1-0 REIAAIN. CONTRACTOR TO REI�,ICY E ALL EXISTING <br /> DISPENSER HAN(".,ING HARD'NARE AS'.�)'C)CIATED EQUIPMENT IN ORDER TO INSTALL NE\,", VST BALANCE EVR PHASE 11 NATIONAL SITF ADAPT CONSULTANT <br /> LINE TO HEALY TANK V, <br /> (E) ROOF OVERHANG (-D EQUIPMENT PER LATEST EDITION OF CARB EXECUTIVE ORDER VR---204 <br /> /----'E) GUARD POST (TYP.) * CONTRACTOR 'TO INSTALL NEW-VEEEE-R ROOT SD,,,FLO'N METERS AT' ALL, cjsPENSERS. <br /> u * CQ�NJRACTOj3, -10' SENSOR CABLING`fHROUGH', D.XIST"NO <br /> NST� LL NEW BOLL.ARD, FIELEC (E AIR-/� I , C q-c I� <br /> A V'b\ rER UNIT <br /> \,ERIIFY/ADJLIST LOCAIIONS bND L I CONTRACTOR TO REF)L,4CE PACKING r'�N[) CHICO IN EXISTING SEAL--OFFS AFTER PULLING NEIN HONITORING CABLING, <br /> PROTECT EXISTING UNDERGROUND CONTRACTOR TO RE--CONNECT ALL EXISTING ELECTRICAL CONDUITS AS REQUIRED. <br /> VENT PIPING AND AND UTILITIES IN <br /> CONTRACTOR T NEW VEEDER -,PENSE ','I THE, <br /> (0 1 N S' ALL (1)- IS6"`PRESSUR'E- SENSOR AT -CTS _R NEAR'D'_ TANKS <br /> I"LACE (TYF1. 6 PLC,S.) <br /> CONTRACTOR INS-rkLL VERTICAL NEAl C_.EAN AIR SEPARATOR UNIT INSIDE STEEL ENCLOSURE ON 7'-0"X7'-0"X,9" 0 <br /> V <br /> THICK CONCRETE PD, SEE SHEET TK" -2 FOR DETAILS <br /> v <br /> CONTRACTOR TO �,,IANIFOLD ALL EXISTI',C7 GASOLINE VENT RISERS & CONNECT I" i,/ENT LINE FROI1 HEALY TANK TO VENT <br /> INSTA,LL NE��',,� HEALY SEE FE N G��' <br /> CLEAN AIR SEPARATOR( 5 STACK I,,1ANIFO[ D PER DETAILS, SLOPE 1/8" PER FOOT FROI`,A NEW HEALY CLEAN AIR SEPARATOR, CONTRACTOR TO <br /> �T <br /> F'-\NK ON 7'x7'x8" VERIFY THAT E)XISIING TANK ✓VENTS AE_ A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING "I.AND PL,�,NNING NaADESIGN E,"PE CIALISTS" <br /> THAT CAI,! DUILT UPON. INSTALL HE, CLEAN AIR SEPARATOR TANK AND ASSOCIATED c> <br /> CONCRETE P,�[) A// SEE EXISTING BUILDING OPENING OR PROPERTY LINE I !_.) 185215 72ND AVENUE SOLJT H <br /> EN(.',I...OS(JRE AND ............. PIPING AND FITTINGS PER NEW CARET E�/R PHASE 11 STANDARDS AND E.O. VR 204. INSFAIA-ATION SHALL BE PER CARR KENT, 1,YASHINGTON 980,32 �2 <br /> BOL.I-/-'ARDS TK2­2 E.C, AN[.) MANUFACTURERS INSTRUCTIONS. SEE DRAWING TK2-1 FOR DETAILS. (425) 251 ---6222 <br /> E <br /> L) CANOPY <br /> SIVE SLAB NOTE: INSTALLATION SHALL, MEET THE STATE APPROVED INSTALI.-APON INSTRUCTIONS, FOR THE HEALY <br /> SYSTEMS INCORPORATED CLEAN A11IR SEPARATOR AND THE STATE APPROVED IN--STATE DIAG NO!"S TICS <br /> INSTALLATION INSTRUCTIONS, <br /> (E) VENT RISERS NO. DATE REVISION DESCRIPTION <br /> w <br /> LLJ 7/27/11 CANISTE� RE�/isir <br /> > CONTRACTOR TO INSTALL NE'N CONCRETE. <br /> F FILLED BOLLj_RDS IN LOCATIONS SHONN. ��N, REISSUE <br /> MT CD <br /> M <br /> 8/17/11 ISSUE FOR BIL) <br /> EXISTING P.I.C, I-_Lj W 'CONTRACTOR TO REMOVE EXISTING VEEIIER ROOT MONITORING PANEL AND INSTALL NEW VEEDER ROOT (TLS--35CR) <br /> PA <br /> EXISTING, E.S,O. z NEL AT THE EXISTING ...00ATION. RE-LAND SENSOR WIRING IN NE'�'� PANEL PER DETAILS & PROGRAM -TO PANEL 9/9/1'1 RE,/. 'VST BALANCE W/ HEkLY <br /> < <br /> C)_ <br /> __j CK MONITOR TANK SUMPS, DISPENSER SUMPS, TANK LEVEL PROVE, ISD FLOWN METER, PRESSURE SENSOR TANK A4 1012511-1 REV. O"ER F-'L 1 4 N I CHECK <br /> - <br /> _j <br /> 0 ANNULAR SPACES, <br /> 0 <br /> (3) EXISIING DOL)BLE Z5\ <br /> _) ✓VEEDER ROOT PANEL TO BE PROGRAWIAEF) BY A CERTIFIED TECHNICIAN UPON COMPLETION (.',,F UPGRADE AND x <br /> (2) z <br /> A'r',U_ U.G, STORAGE v2 PRIOR TO PLAC ING EQUIPMENT BACK IN `S' RVICE A2_ <br /> x <br /> TANKS� 0 u� <br /> V) < <br /> CD <br /> x 10 HERE EXISTING TURBINES SERVE IN A AND SLAVE CONFIGURATION, CONTRACTOR TO RE\IdIRE SUCH 'THAI- <br /> REI`,,1O'vF AND REPLACE(,7T <br /> rL z THE VEEDER ROOT 'UTOI`A�'TIC TANK G',,UGE DET*1___RI`,1INES WHICH TURBINE IS STARIED AS THE ��IASTER BASED ON A-L <br /> EXISTING MONITORING NEW THE LEVEI, OF PRODUCT IN THE -TANKS, SEE DRA\',IING TIK3­2 FOR DETAILS <br /> C�D LLI <br /> CONS01 <br /> PRESSURE M <br /> RELIOVE AND F�E P LA C E -J SENSr1R A� <br /> A6) <br /> NO NE,",! ELECTRICAL LOADS ARE BEING A',`�,, A RESULT OF THIS PROJECT CONTRACTOR TO ENSURE <br /> EXISTING TURBINE -THAT 'LL NEW RETRO--FIT '�/O'__)K FERFORiJ ON "HE EXISTING DISPENSERS SHALL BE IN CONFORMANCE AND <br /> CONTROLLERS A <br /> IdE.EfS THE REQUIREMENTS OF AS SPECIFIED IN THE PERMIT CONDITIONS. <br /> 12 '3EAL: <br /> J" <br /> CONTRACTOR -1-0 FIELD �ERIFY TI--IE INSTA! '31GN OF FIRE EXTINGUISHER MINIMUM RATED 2-1 20BC Vv'ITHN <br /> 4' <br /> TING VAS OR LOCATION OF' 75 CO 20' OF' THE TANK�.. <br /> REMOVE EXIS <br /> I-RANS17ION SUP' <br /> AF'P <br /> -RUBB <br /> Qi�. CONTRACTOR TO REMOVE EXISTING RED-j,`,C'KET CPT CONTROLLERS, AND INSTALL NEW II PEIRC, TURBINE HAL P <br /> --<j FXIS-IING GII., Cl D, CONTROLLEIRS. <br /> _1 -BARCO B78 SINGLE HOSE <br /> ------- EXISTING VAPOR LINE Ci�2 <br /> _J: VA <br /> ASSUMED LOAl <br /> '00/ <br /> ED TO REMAIN, CONVERT DISPENSERS CONTRACTOR TO REMOVE EXISTING ,,FCR L(.)W--('DINT MANHOLE, TRANSITION SUMP FITTINGS (RELOCATE EXISTING <br /> -ION 3 PRODUCT' `,1PD'S <br /> PER SIDE BLENDING <br /> VAPOR RECOVERY SYSTEM TO V`;7 0< TO NEAl VAPOR POT SUHP),SUI`,1P SENSOR 6/30/ 0) <br /> Ll <br /> BALANCE EVR PHASE 11 WITH ISD (TYR, cl� <br /> 3 PRODUCT & V <br /> EXISTIN( OF 4) <br /> ........... - ------------ ------- ...... - ------------- --------, <br /> VAPOR LINES ASSUMED CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING VAPOR LINE CUT & ROUTE VAPOR LINE INTO NEW TR�NSJTION OF' C Au <br /> > I <br /> T 8, CONTAINiAENT SUMP. F�EINSTALIL EXISTING SUMP SENSOR AT L&AEST POINT IN SUMP, SEE SHEET rK4-­1 FOR DETAILS <br /> EXISTING TURBINE EXISTING PRODUC i <br /> S U1 H P C-0 LOCATION <br /> VAPOR LINES ASSUVlED MA <br /> -QQREQ.E _LML$1�E MI.- <br /> LOCATION CO REMAIN NEVV POINT OF CONNECTION ASSUME <br /> orf <br /> C1 CONTRACTOR TO) INSTALL_ NEW SECCND�'RILY CONTAINED STAGE 11 CONDENSATE TRAP IA'ITH RISER AND PORT FITTINGS <br /> EXISTING VAPOR LINE LOCATION <br /> 'AS SHOWN IN LATEST EDITION OF CARB F.), V'R-204, INSTAI L NEW LIQUID R OAT SENSOR IN CONDENSATE TRAP TANK. <br /> ASS�JMED LOCATION 0 SEE SHEET FOR DETAILS. <br /> F <br /> Z, <br /> TION <br /> NE POINT OF CONNED; SEE u� 17 <br /> NEW SfAGE I SECONDARILY CONTRACTOR TO PERFORM �LIL REQUIRED VAPOR RECOVERY -TESTING PER LATEST EDITION OF A. E,O. VR <br /> ASSU!'JE LOCATION -------------------- x <br /> CONTAINED CONDENSATE TRAP LJ AND LOCAL. AIR POLLUTION CONTROL �'-,U7HORITY AND FORWARD RESULTS T --O`,'��NER AND TO JURISDICTION AS <br /> E -TING PRODUCT LINE <br /> SPECIFIED_ IN THE PERMIT CONDITIONS <br /> , <br /> I S , , <br /> EPL.,Aa1j_A S.( <br /> UK U.20-25�L&kLIR.- <br /> D REMAIN <br /> TRANSITION SUMP T( <br /> CF8 -LL (1) N EVV TY P E ABC 20# PORT'BLE FIRE EXTINGUISHER IN ENCLOSURE ON CANOPY COLUMN, TYP, <br /> F,-. INSTA <br /> 2"SINGLE WALL FIBERGLASS CONTAINMENT PIPE <br /> FOR COPPER SUCTION LINE FROM TANK TURBINE, <br /> CONTRACTOR TO INSTALL NEW IF EXISTING IS <br /> 3 <br /> NOT PRESENT, SLCPE PIPE BACK TOWARDS <br /> PENETRATION DEVELOPMENT INFORMATION: <br /> TLIRBINE, USE 2" RIGID PENE ' <br /> FITTINGS AT -1-1-IE TlJRBINE AND TRANSITION <br /> UNDERGROUND STORAGE X` <br /> SUMPS, <br /> TANK STAN DAR DS <br /> ............. --------- --------- EVR PHASE 11 WITH ISD <br /> COMPLIANCE NOTES V-8eO 2008 SERIES <br /> CALIFORNIA MARKET <br /> 1. Li <br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING /,,NY 'WORK, <br /> E, <br /> ANY DISCREPANCY SHALL BE CALLED TO "THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE ADDRESS: <br /> U) <br /> EXISTING DRIVEV\IAY APPROACH PROCEEDING INITH THE WORK. <br /> EXISTING PLANTER <br /> EXISTING CONCRETE SIDE'NALK I <br /> EXISTING DRIVEVI,,AY APPROACH 2. GENERAL CONTRACTOR SHALL OBTAIN NECFSSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF 2908 BENJAMLr <br /> IN HOL'T DR <br /> -TRENCHES 5'-0" OR N10RE IN DEPTH INTO v`VHICH A PERSON IS REQUIRED 1-0 DESCEND. STOCKTON, CA <br /> 3. ALL MATERIALS SHALL BE COMPARBLE WIIII USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED J <br /> CODES, LOCAL CODES AND GOVERNING) AUTHOkIITIES. <br /> 'T_ <br /> FACILITY No, 02133 <br /> PLYMOUTH DRIVE 4. FUELING SYSTEM TO BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNERS REPRESENTAIWE PRIOR TO <br /> BEING PLACE BACK IN SERVICE. DESIGNED BY, AH/Ov ALLIANCE Z&DM: <br /> EVR PHASE 11 AND ISD UPGRADE SITE PLAN <br /> CHECKED BY, ov BP REPW C:) <br /> —--------- ----------------- 5. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FOR0,1ARDED AND APPROVED BY <br /> S C A,L E: 1 10 .,,- DRAM BY: ALLIANCE PM: <br /> )VERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION (AS' APPLI('ABL.E). AH <br /> G <br /> VER5I0N: v.8.o PROJECT NO: <br /> AN AO IN COU <br /> C. OF PRIOTANK.R TO FUEL BEING PUMPED, SIATION MUST HAVE VEEDER ROOF FUNCTIONAL AND MONITORINC', ANNULAR SPACES <br /> SJONTY BCE �._ <br /> 380 <br /> ENVIRONMENTAL HEALTH DIN' DRAWING <br /> HITS:7 <br /> 600 E. MAIN ST. 7 REFERENCED CODES SHALL INCLUDE 2010 CBC; 2010 CFC; 2010 CEC; 2010 CMC. EVR PHASE 11I AND ISD <br /> STOCKTON CA 95202 <br /> UPGRADE SITE PLAN <br /> (209) 468-,3420 & FIRE SAFETY DURING CONSTRUCTION SHALL FOLL.ON 2010 CFC, FIRE EXTINGUISHERS SHALL. BE PRO',,,,IDI-D, THE <br /> Approved <br /> AUTOMATIC FIRE SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT MLL TIMES, UNDER NO CIRCUHSTANC"E SHALL THE <br /> L) Approved W10w changes:See Remark$ FIRE SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT, <br /> C) Disapproved: See Remarks <br /> Remarks DRAWING DISCLAIMER NOTE AOMD INFORMATION SHEET NO: <br /> = <br /> THIS SITE PLAN HAIS, BEEN PREPARED VWIHOUT BENEFIT OF TITLE REPORT, NO. F(JELING POSITIC)NS:7717_7Z= <br /> Call Toll Free <br /> 1 (888) 268-0808 SURVEY, OR LEGAL DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS NO. GASOLINE NOZZI ES: 8 <br /> date ............�111.11� <br /> TWO DOES NOT �I`�ARRANT THE ACTUAL LOCATION OF FIROPERTY LINES AND <br /> I y 0 5 10 20 NO. DIESEL NOZZLES: 0 CD <br /> WORKING DAYS SETBACKS, IT IS THE RESPONSIBILIFY OF THE INSTALLING CONTRACTOR TO <br /> BEFORE YOU -Y PROPERY LINES AND SETBACK DISTANCES WHERE THEY MAY AFFECT <br /> VERIF <br /> or approvo any Omission or DIG <br /> -�mon and does rrOt authorize 7 <br /> he �,�__9, <br /> Approval ext��nds on17 to tjj7t ,�i_11Tu'7-shown TK1 ml <br /> deviation from requirernc,,rq,,3 of stcite laws or(oCal Ordinances, THE PLACEMENT OF NEW EQUIPMENT AS A PART OF THIS PROJECT, TF-IE <br /> DRAWING REFLECTS EXISTING SITE CONDITIONS AS PROVIDED BY BE, FROM <br /> "A <br /> ARCHIVE RECORDS, <br />