|
PIPING LEGEND CLIENT:
<br /> EXISTING 2" `.G. r)OUBLE WAIL PRODUCT PIPING,,
<br /> NV EXIr:TING 2" OR 3" F.G. SINGLE v'v'M..L V iPOR RECOVERY PIPING
<br /> SINGLE 'JV ALL `vENT PIPING
<br /> EXISTING 2" F.G
<br /> GENERAL____a_.._ ____._.__.
<br /> -- N-OTE-S
<br /> TRU TION IS EXISTING AND TO FLEMAIN UNLESS NOTED OTHERAIISE,
<br /> ALL CONS
<br /> C
<br /> ------ ARCO
<br /> -THE CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD bP WEST COAST PRODUCTS,LLC
<br /> FINISHES IN PLACE. -0
<br /> SECONDARY CONTAINMENT P I R ING IS SHO!VN BY NOTE ONLY, NOT GRAPHICALLY, ALL EXISTING PRODUCT 7L[F�NEE �ANACER7ACF7N
<br /> IDI PING IS DOUBLE CONTAINMENT PIPE. VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL PIPE.
<br /> EVR PHASE 11 AND ISD UPGRADE INSTALLATION NOTES
<br /> 0
<br /> 0
<br /> CD EXISTING (3) 12,I_00 CALLON DOUBLE W'ALL TANKS AND PIPING SYSTEMS TO REMAIN, THERE SH/311 BE NO WORK
<br /> a.
<br /> A F ART OF THIS SCOPE.
<br /> PERFORMED ON ANY BURIED PIPING 46 A
<br /> NOT USED
<br /> < DE
<br /> L-U
<br /> N EAv/ 1 VEN T TIE IN
<br /> EXISFING (4) GIL.BARCO 378 DISPENSERS 1-0 REIAAIN. CONTRACTOR TO REI�,ICY E ALL EXISTING
<br /> DISPENSER HAN(".,ING HARD'NARE AS'.�)'C)CIATED EQUIPMENT IN ORDER TO INSTALL NE\,", VST BALANCE EVR PHASE 11 NATIONAL SITF ADAPT CONSULTANT
<br /> LINE TO HEALY TANK V,
<br /> (E) ROOF OVERHANG (-D EQUIPMENT PER LATEST EDITION OF CARB EXECUTIVE ORDER VR---204
<br /> /----'E) GUARD POST (TYP.) * CONTRACTOR 'TO INSTALL NEW-VEEEE-R ROOT SD,,,FLO'N METERS AT' ALL, cjsPENSERS.
<br /> u * CQ�NJRACTOj3, -10' SENSOR CABLING`fHROUGH', D.XIST"NO
<br /> NST� LL NEW BOLL.ARD, FIELEC (E AIR-/� I , C q-c I�
<br /> A V'b\ rER UNIT
<br /> \,ERIIFY/ADJLIST LOCAIIONS bND L I CONTRACTOR TO REF)L,4CE PACKING r'�N[) CHICO IN EXISTING SEAL--OFFS AFTER PULLING NEIN HONITORING CABLING,
<br /> PROTECT EXISTING UNDERGROUND CONTRACTOR TO RE--CONNECT ALL EXISTING ELECTRICAL CONDUITS AS REQUIRED.
<br /> VENT PIPING AND AND UTILITIES IN
<br /> CONTRACTOR T NEW VEEDER -,PENSE ','I THE,
<br /> (0 1 N S' ALL (1)- IS6"`PRESSUR'E- SENSOR AT -CTS _R NEAR'D'_ TANKS
<br /> I"LACE (TYF1. 6 PLC,S.)
<br /> CONTRACTOR INS-rkLL VERTICAL NEAl C_.EAN AIR SEPARATOR UNIT INSIDE STEEL ENCLOSURE ON 7'-0"X7'-0"X,9" 0
<br /> V
<br /> THICK CONCRETE PD, SEE SHEET TK" -2 FOR DETAILS
<br /> v
<br /> CONTRACTOR TO �,,IANIFOLD ALL EXISTI',C7 GASOLINE VENT RISERS & CONNECT I" i,/ENT LINE FROI1 HEALY TANK TO VENT
<br /> INSTA,LL NE��',,� HEALY SEE FE N G��'
<br /> CLEAN AIR SEPARATOR( 5 STACK I,,1ANIFO[ D PER DETAILS, SLOPE 1/8" PER FOOT FROI`,A NEW HEALY CLEAN AIR SEPARATOR, CONTRACTOR TO
<br /> �T
<br /> F'-\NK ON 7'x7'x8" VERIFY THAT E)XISIING TANK ✓VENTS AE_ A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING "I.AND PL,�,NNING NaADESIGN E,"PE CIALISTS"
<br /> THAT CAI,! DUILT UPON. INSTALL HE, CLEAN AIR SEPARATOR TANK AND ASSOCIATED c>
<br /> CONCRETE P,�[) A// SEE EXISTING BUILDING OPENING OR PROPERTY LINE I !_.) 185215 72ND AVENUE SOLJT H
<br /> EN(.',I...OS(JRE AND ............. PIPING AND FITTINGS PER NEW CARET E�/R PHASE 11 STANDARDS AND E.O. VR 204. INSFAIA-ATION SHALL BE PER CARR KENT, 1,YASHINGTON 980,32 �2
<br /> BOL.I-/-'ARDS TK22 E.C, AN[.) MANUFACTURERS INSTRUCTIONS. SEE DRAWING TK2-1 FOR DETAILS. (425) 251 ---6222
<br /> E
<br /> L) CANOPY
<br /> SIVE SLAB NOTE: INSTALLATION SHALL, MEET THE STATE APPROVED INSTALI.-APON INSTRUCTIONS, FOR THE HEALY
<br /> SYSTEMS INCORPORATED CLEAN A11IR SEPARATOR AND THE STATE APPROVED IN--STATE DIAG NO!"S TICS
<br /> INSTALLATION INSTRUCTIONS,
<br /> (E) VENT RISERS NO. DATE REVISION DESCRIPTION
<br /> w
<br /> LLJ 7/27/11 CANISTE� RE�/isir
<br /> > CONTRACTOR TO INSTALL NE'N CONCRETE.
<br /> F FILLED BOLLj_RDS IN LOCATIONS SHONN. ��N, REISSUE
<br /> MT CD
<br /> M
<br /> 8/17/11 ISSUE FOR BIL)
<br /> EXISTING P.I.C, I-_Lj W 'CONTRACTOR TO REMOVE EXISTING VEEIIER ROOT MONITORING PANEL AND INSTALL NEW VEEDER ROOT (TLS--35CR)
<br /> PA
<br /> EXISTING, E.S,O. z NEL AT THE EXISTING ...00ATION. RE-LAND SENSOR WIRING IN NE'�'� PANEL PER DETAILS & PROGRAM -TO PANEL 9/9/1'1 RE,/. 'VST BALANCE W/ HEkLY
<br /> <
<br /> C)_
<br /> __j CK MONITOR TANK SUMPS, DISPENSER SUMPS, TANK LEVEL PROVE, ISD FLOWN METER, PRESSURE SENSOR TANK A4 1012511-1 REV. O"ER F-'L 1 4 N I CHECK
<br /> -
<br /> _j
<br /> 0 ANNULAR SPACES,
<br /> 0
<br /> (3) EXISIING DOL)BLE Z5\
<br /> _) ✓VEEDER ROOT PANEL TO BE PROGRAWIAEF) BY A CERTIFIED TECHNICIAN UPON COMPLETION (.',,F UPGRADE AND x
<br /> (2) z
<br /> A'r',U_ U.G, STORAGE v2 PRIOR TO PLAC ING EQUIPMENT BACK IN `S' RVICE A2_
<br /> x
<br /> TANKS� 0 u�
<br /> V) <
<br /> CD
<br /> x 10 HERE EXISTING TURBINES SERVE IN A AND SLAVE CONFIGURATION, CONTRACTOR TO RE\IdIRE SUCH 'THAI-
<br /> REI`,,1O'vF AND REPLACE(,7T
<br /> rL z THE VEEDER ROOT 'UTOI`A�'TIC TANK G',,UGE DET*1___RI`,1INES WHICH TURBINE IS STARIED AS THE ��IASTER BASED ON A-L
<br /> EXISTING MONITORING NEW THE LEVEI, OF PRODUCT IN THE -TANKS, SEE DRA\',IING TIK32 FOR DETAILS
<br /> C�D LLI
<br /> CONS01
<br /> PRESSURE M
<br /> RELIOVE AND F�E P LA C E -J SENSr1R A�
<br /> A6)
<br /> NO NE,",! ELECTRICAL LOADS ARE BEING A',`�,, A RESULT OF THIS PROJECT CONTRACTOR TO ENSURE
<br /> EXISTING TURBINE -THAT 'LL NEW RETRO--FIT '�/O'__)K FERFORiJ ON "HE EXISTING DISPENSERS SHALL BE IN CONFORMANCE AND
<br /> CONTROLLERS A
<br /> IdE.EfS THE REQUIREMENTS OF AS SPECIFIED IN THE PERMIT CONDITIONS.
<br /> 12 '3EAL:
<br /> J"
<br /> CONTRACTOR -1-0 FIELD �ERIFY TI--IE INSTA! '31GN OF FIRE EXTINGUISHER MINIMUM RATED 2-1 20BC Vv'ITHN
<br /> 4'
<br /> TING VAS OR LOCATION OF' 75 CO 20' OF' THE TANK�..
<br /> REMOVE EXIS
<br /> I-RANS17ION SUP'
<br /> AF'P
<br /> -RUBB
<br /> Qi�. CONTRACTOR TO REMOVE EXISTING RED-j,`,C'KET CPT CONTROLLERS, AND INSTALL NEW II PEIRC, TURBINE HAL P
<br /> --<j FXIS-IING GII., Cl D, CONTROLLEIRS.
<br /> _1 -BARCO B78 SINGLE HOSE
<br /> ------- EXISTING VAPOR LINE Ci�2
<br /> _J: VA
<br /> ASSUMED LOAl
<br /> '00/
<br /> ED TO REMAIN, CONVERT DISPENSERS CONTRACTOR TO REMOVE EXISTING ,,FCR L(.)W--('DINT MANHOLE, TRANSITION SUMP FITTINGS (RELOCATE EXISTING
<br /> -ION 3 PRODUCT' `,1PD'S
<br /> PER SIDE BLENDING
<br /> VAPOR RECOVERY SYSTEM TO V`;7 0< TO NEAl VAPOR POT SUHP),SUI`,1P SENSOR 6/30/ 0)
<br /> Ll
<br /> BALANCE EVR PHASE 11 WITH ISD (TYR, cl�
<br /> 3 PRODUCT & V
<br /> EXISTIN( OF 4)
<br /> ........... - ------------ ------- ...... - ------------- --------,
<br /> VAPOR LINES ASSUMED CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING VAPOR LINE CUT & ROUTE VAPOR LINE INTO NEW TR�NSJTION OF' C Au
<br /> > I
<br /> T 8, CONTAINiAENT SUMP. F�EINSTALIL EXISTING SUMP SENSOR AT L&AEST POINT IN SUMP, SEE SHEET rK4-1 FOR DETAILS
<br /> EXISTING TURBINE EXISTING PRODUC i
<br /> S U1 H P C-0 LOCATION
<br /> VAPOR LINES ASSUVlED MA
<br /> -QQREQ.E _LML$1�E MI.-
<br /> LOCATION CO REMAIN NEVV POINT OF CONNECTION ASSUME
<br /> orf
<br /> C1 CONTRACTOR TO) INSTALL_ NEW SECCND�'RILY CONTAINED STAGE 11 CONDENSATE TRAP IA'ITH RISER AND PORT FITTINGS
<br /> EXISTING VAPOR LINE LOCATION
<br /> 'AS SHOWN IN LATEST EDITION OF CARB F.), V'R-204, INSTAI L NEW LIQUID R OAT SENSOR IN CONDENSATE TRAP TANK.
<br /> ASS�JMED LOCATION 0 SEE SHEET FOR DETAILS.
<br /> F
<br /> Z,
<br /> TION
<br /> NE POINT OF CONNED; SEE u� 17
<br /> NEW SfAGE I SECONDARILY CONTRACTOR TO PERFORM �LIL REQUIRED VAPOR RECOVERY -TESTING PER LATEST EDITION OF A. E,O. VR
<br /> ASSU!'JE LOCATION -------------------- x
<br /> CONTAINED CONDENSATE TRAP LJ AND LOCAL. AIR POLLUTION CONTROL �'-,U7HORITY AND FORWARD RESULTS T --O`,'��NER AND TO JURISDICTION AS
<br /> E -TING PRODUCT LINE
<br /> SPECIFIED_ IN THE PERMIT CONDITIONS
<br /> ,
<br /> I S , ,
<br /> EPL.,Aa1j_A S.(
<br /> UK U.20-25�L&kLIR.-
<br /> D REMAIN
<br /> TRANSITION SUMP T(
<br /> CF8 -LL (1) N EVV TY P E ABC 20# PORT'BLE FIRE EXTINGUISHER IN ENCLOSURE ON CANOPY COLUMN, TYP,
<br /> F,-. INSTA
<br /> 2"SINGLE WALL FIBERGLASS CONTAINMENT PIPE
<br /> FOR COPPER SUCTION LINE FROM TANK TURBINE,
<br /> CONTRACTOR TO INSTALL NEW IF EXISTING IS
<br /> 3
<br /> NOT PRESENT, SLCPE PIPE BACK TOWARDS
<br /> PENETRATION DEVELOPMENT INFORMATION:
<br /> TLIRBINE, USE 2" RIGID PENE '
<br /> FITTINGS AT -1-1-IE TlJRBINE AND TRANSITION
<br /> UNDERGROUND STORAGE X`
<br /> SUMPS,
<br /> TANK STAN DAR DS
<br /> ............. --------- --------- EVR PHASE 11 WITH ISD
<br /> COMPLIANCE NOTES V-8eO 2008 SERIES
<br /> CALIFORNIA MARKET
<br /> 1. Li
<br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING /,,NY 'WORK,
<br /> E,
<br /> ANY DISCREPANCY SHALL BE CALLED TO "THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE ADDRESS:
<br /> U)
<br /> EXISTING DRIVEV\IAY APPROACH PROCEEDING INITH THE WORK.
<br /> EXISTING PLANTER
<br /> EXISTING CONCRETE SIDE'NALK I
<br /> EXISTING DRIVEVI,,AY APPROACH 2. GENERAL CONTRACTOR SHALL OBTAIN NECFSSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF 2908 BENJAMLr
<br /> IN HOL'T DR
<br /> -TRENCHES 5'-0" OR N10RE IN DEPTH INTO v`VHICH A PERSON IS REQUIRED 1-0 DESCEND. STOCKTON, CA
<br /> 3. ALL MATERIALS SHALL BE COMPARBLE WIIII USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED J
<br /> CODES, LOCAL CODES AND GOVERNING) AUTHOkIITIES.
<br /> 'T_
<br /> FACILITY No, 02133
<br /> PLYMOUTH DRIVE 4. FUELING SYSTEM TO BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNERS REPRESENTAIWE PRIOR TO
<br /> BEING PLACE BACK IN SERVICE. DESIGNED BY, AH/Ov ALLIANCE Z&DM:
<br /> EVR PHASE 11 AND ISD UPGRADE SITE PLAN
<br /> CHECKED BY, ov BP REPW C:)
<br /> —--------- ----------------- 5. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FOR0,1ARDED AND APPROVED BY
<br /> S C A,L E: 1 10 .,,- DRAM BY: ALLIANCE PM:
<br /> )VERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION (AS' APPLI('ABL.E). AH
<br /> G
<br /> VER5I0N: v.8.o PROJECT NO:
<br /> AN AO IN COU
<br /> C. OF PRIOTANK.R TO FUEL BEING PUMPED, SIATION MUST HAVE VEEDER ROOF FUNCTIONAL AND MONITORINC', ANNULAR SPACES
<br /> SJONTY BCE �._
<br /> 380
<br /> ENVIRONMENTAL HEALTH DIN' DRAWING
<br /> HITS:7
<br /> 600 E. MAIN ST. 7 REFERENCED CODES SHALL INCLUDE 2010 CBC; 2010 CFC; 2010 CEC; 2010 CMC. EVR PHASE 11I AND ISD
<br /> STOCKTON CA 95202
<br /> UPGRADE SITE PLAN
<br /> (209) 468-,3420 & FIRE SAFETY DURING CONSTRUCTION SHALL FOLL.ON 2010 CFC, FIRE EXTINGUISHERS SHALL. BE PRO',,,,IDI-D, THE
<br /> Approved
<br /> AUTOMATIC FIRE SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT MLL TIMES, UNDER NO CIRCUHSTANC"E SHALL THE
<br /> L) Approved W10w changes:See Remark$ FIRE SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT,
<br /> C) Disapproved: See Remarks
<br /> Remarks DRAWING DISCLAIMER NOTE AOMD INFORMATION SHEET NO:
<br /> =
<br /> THIS SITE PLAN HAIS, BEEN PREPARED VWIHOUT BENEFIT OF TITLE REPORT, NO. F(JELING POSITIC)NS:7717_7Z=
<br /> Call Toll Free
<br /> 1 (888) 268-0808 SURVEY, OR LEGAL DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS NO. GASOLINE NOZZI ES: 8
<br /> date ............�111.11�
<br /> TWO DOES NOT �I`�ARRANT THE ACTUAL LOCATION OF FIROPERTY LINES AND
<br /> I y 0 5 10 20 NO. DIESEL NOZZLES: 0 CD
<br /> WORKING DAYS SETBACKS, IT IS THE RESPONSIBILIFY OF THE INSTALLING CONTRACTOR TO
<br /> BEFORE YOU -Y PROPERY LINES AND SETBACK DISTANCES WHERE THEY MAY AFFECT
<br /> VERIF
<br /> or approvo any Omission or DIG
<br /> -�mon and does rrOt authorize 7
<br /> he �,�__9,
<br /> Approval ext��nds on17 to tjj7t ,�i_11Tu'7-shown TK1 ml
<br /> deviation from requirernc,,rq,,3 of stcite laws or(oCal Ordinances, THE PLACEMENT OF NEW EQUIPMENT AS A PART OF THIS PROJECT, TF-IE
<br /> DRAWING REFLECTS EXISTING SITE CONDITIONS AS PROVIDED BY BE, FROM
<br /> "A
<br /> ARCHIVE RECORDS,
<br />
|