My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> , <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> • MONITORING PLAN (Page 2 of 2) <br /> .t - VI;CTN��R DLS�?'�NSER C(}NTAINMENT(UDC}MONTT®RING .... <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54b <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> -- -— - ----------------------------------- <br /> - --- - -------- - - - ---------•------------------ <br /> PANEL MANUFACTURER:VEEDER ROOT a9ass MGDEL iYES-350 490-%. <br /> LEAK SENSOR MANUFACTURER:VEEDER ROOT 4____ MODEL#(5):794380-323 490-5g <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS N a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN N a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. M a.YES ❑b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS M i,SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: avo 6,48 <br /> _ UDC INTERSTITIAL SPACE IS MONITORED BY: [711.LIQUID-❑2.PRESSURE ❑3_VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> . '. 'YlT P�RI(�►ATC SYSTElVx;TEST�IVG = `. <br /> ❑ 1. BLD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490 tis• <br /> __ L I DETECTION(ELD�MUST BE PERFORMED. PERIODIC EL D IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR §26441) - <br /> ®2,SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS, 490-66 <br /> -- <br /> ----------------------------------------------------------------•------------------------------— - <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> .> . .;,, `VII�;I 1`iIECORDSEEiP'ING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490-69a ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 490-6sc <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-Oo <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-6sg <br /> N Equipment maintenance and calibration records. 490-68h <br /> IX TR,AINING<: ,� - <br /> N Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITYO(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49o-Od <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69k M69i <br /> This facility has a`Designated UST Operator"who has passed the California UST System Operator Exam administered by the httemational Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.'Phis <br /> training will include,but is not limited to,the following-. <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> A Names of contact person(s)for emergencies and monitoring alarms.490-7o <br /> X >coMMENTsb� rYort�tor�Tl®n <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49D-7i <br /> *Monitoring systems manually maintained by contracted,licensed pump and tank technicians.Best Management Practices are <br /> maintained in the H.S.S.E.Retail Facility Programs Manual(Green Binder). Tank overfill prevention method used:external audio <br /> and visual alarms when tank reaches 90%capacity.VAPOR POT SUMP MONITORED BY VEEDER ROOT 794380-323& <br /> 794380420 SENSORS.ATG SUMP MONITORED BY VEEDER ROOT 794380-323. <br /> ?I 'ER501L RSP�NSIBI[.IT]�S , <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME BP WEST COAST PRODUCTS LLC 490-72 TITLE COMPLIANCE DEPARTMENT 490.73 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII ®wNER(QPRRATQRGNQIIRI< <br /> CERTIFICATION:I certify tha a information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE KY644k- 490-76 DATE: ry 490-77 <br /> REEREA9NMLG_._U_1- no "r owar t Iffi 3 J <br /> APPLICANT NAME(print): 490-79 APPLICANTTITLE: 490-79 <br /> BRAD MCCRACKEN VICE PRESIDENT <br /> Arco 02133,Belshire Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.