Laserfiche WebLink
t <br /> COMMENTS/ADDITIONAL INFORMATION <br /> (Section X.Comments/Additional Information continued...) <br /> *Monitoring systems manually maintained by contracted,licensed pump and tank technicians.Best <br /> Management Practices are maintained in the H.S.S.E.Retail Facility Programs Manual(Green Binder). <br /> TANK OVERFILL PREVENTION METHOD USED:EXTERNAL AUDIO AND VISUAL ALARMS <br /> WHEN TANK REACHES 90% CAPACITY. <br /> VAPOR POT OVERFILL(HIGH LIQUID)SENSOR:VEEDER ROOT 794380-420, INSTALLED TWO <br /> INCHES ABOVE THE BOTTOM OF THE VAPOR POT. <br /> DOUBLE WALLED VAPOR POT MONITORED BY:VEEDER ROOT 794380-323 IN THE SUMP AND <br /> VEEDER ROOT 794380-420 AT THE VERY BOTTOM OF THE ANNULAR SPACE. <br /> ATG SUMP MONITORED BY VEEDER ROOT 794380-323 <br /> Arco 02133,Belshire Environmental Services <br />