Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 1 <br /> (Two pages per tank) <br /> Page_of_ <br /> TYPE OF ACTION ❑ 1.NEW PERMIT ❑ 4.AMENDED PERMIT5.CHANGE OF INFORMATION ❑ 6.TEMPORARY TANK CLOSURE 430. <br /> (Check one item only) ❑ 3.RENEWAL PERMIT ❑ 7.PERMANENTLY CLOSED ON SITE <br /> (Specify reason) (Specify-n) ❑ 8.TANK REMOVED <br /> BUSINESS AME(S".FA UMAAMEorDBA-Doing <br /> B- As) 3. FACILITY Ia 1• <br /> CLU <br /> LOCATION wrtHiN SITE(optanal> 431, <br /> I.TANK DESCRIPTION <br /> (A scaled plot plan with the location of the UST system including buildings and landmarks shall be submitted to the local agency.) <br /> TANK ID$#�a� 432• TANK <br /> (MANUFACTURER 433• COMPARTMENTALIZED TANK Yes No 434. <br /> ®-, `°�t✓(/P� ®\ L f ..? If"les,,,complete one page for ewh wmpaztmem. <br /> DATE INSTALLED 435• TANK CAPACITY IN GALLONS 436• NUMBER OF COMPARTMENTS 437 <br /> (YEAR/MO)4 <br /> /q <br /> ADDITIONAL DESCRIPTION(For local use only) 438. <br /> II.TANK CONTENTS <br /> TANK USE 439• PETROLEUM TYPE 440, <br /> 1. MOTOR VEHICLE FUEL ®la. REGULAR UNLEADED ❑2. LEADED ❑5. JET FUEL <br /> (If checked,complete Petroleum Type) b. PREMIUM UNLEADED ❑3. DIESEL ❑6. AVIATION GAS <br /> ❑ 2. NON-FUEL PETROLEUM ❑Ic. MIDGRADE UNLEADED ❑4. GASOHOL ❑99.OTHER: <br /> ❑ 3. CHEMICAL PRODUCT COMMON NAME (from Hazardous Materials Inventory page) 441. CAS#(from Hazardous Materials Inventorypage) 442• <br /> ❑ 4. HAZARDOUS WASTE <br /> (Inckules Used Oil) <br /> ❑ 95.UNKNOWN <br /> III.TANK CONSTRUCTION <br /> TYPE OF TANK ❑1. SINGLE WALL ❑3. SINGLE WALL WITH EXTERIOR ❑5. SINGLE WALL WITH INTERNAL BLADDER SYSTEM 443• <br /> (Check one item only) MEMBRANE LINER ❑95. UNKNOWN <br /> jd 2. DOUBLE WALL 4. SINGLE WALL IN A VAULT 99. OTHER <br /> TANK MATERIAL-primary tank L BARE STEEL X3. FIBERGLASS/PLASTIC 8 5. CONCRETE ❑95.UNKNOWN 444. <br /> (Check one item only) ❑2. STAINLESS STEEL [14. STEEL CLAD W/FIBERGLASS ❑8. FRP COMPATIBLE ❑99.OTHER: <br /> REINFORCED PLASTIC(FRP W/100%METHANOL <br /> TANK MATERIAL-secondary tank 1. BARE STEEL 3. FIBERGLASS/PLASTICLj 8. FRP COMPTIBLE W/100%METHANOL 0 95.UNKNOWN 445. <br /> (Check one item only) ❑2. STAINLESS STEEL[14. STEEL CLAD W/FIBERGLASS ❑9. FRP NON-CORRODABLE JACKET ❑99.OTHER <br /> REINFORCED PLASTIC(FRP) [110. COATED STEEL <br /> 5. CONCRETE <br /> TANK INTERIOR LINING L RUBBER LINED 3.EPDXY LINING .GLASS LINING 95.UNKNOWN 446. DATE INSTALLED 447. <br /> OR COATING ❑2.ALKYD LINING ❑4.PHENOLIC LINING [16.UNLINED ❑99.OTHER <br /> (Check one item only) 11 <br /> OTHER CORROSION 1.MANUFACTURED CATHODIC 29 3.FIBERGLASS REINFORCED PLASTIC AP95.UNKNOWN 448. DATE INSTALLED 449. <br /> PROTECTION PROTECTION 4.IMPRESSED CURRENT .OTHER <br /> If licabk 2.SACRIFICIAL ANODE <br /> SPILL AND OVERFIL YEAR INSTALLED 450 TYPE 451. OVERFILL PROTECTION EQ IPMENT: YEAR INSTALLED 452. <br /> (Check all that apply) 1.SPILL CONTAINMENT 1.ALARM AM4.FILL TUBE SHUT OFF VALVE <br /> 2.DROP TUBE 2.BALL FLOAT_ ❑4.EXEMPT <br /> 3.STRIKER PLATE <br /> IV.TANK LEAK DETECTION <br /> (A description of the monitoring program shall be submitted to the local agency.) <br /> IF SINGLE WALL TANK 453• IF RUBLE WALL TANK OR TANK WITH BLADDER 454• <br /> (Check all that apply) (Check one item only) <br /> [11.VISUAL(EXPOSED PORTION ONLY) 1715.MANUAL TANK GAUGING(MTG) ❑1.VISUAL(SINGLE WALL IN VAULT ONLY) <br /> ❑2.AUTOMATIC TANK GAUGING(ATG) ❑6.VADOSE ZONE CONTINUOUS INTERSTITIAL MONITORING <br /> ❑3.CONTINUOUS ATG ❑7.GROUNDWATER ❑3.MANUAL MONITORING <br /> ❑4.STATISTICAL INVENTORY RECONCILIATION [18.TANK TESTING <br /> (SIR)+BIENNIAL TANK TESTING ❑99.OTHER <br /> V.TANK CLOSURE INFORMATION/ PERMANENT CLOSURE IN PLACE <br /> ESTIMATED DATE LAST USED(YR/MO/DAY) 455• 1 ESTIMATED QUANTITY OF SUBSTANCE REMAINING 456• 1 TANK FILLED WITH INERT MATERIAL? 457• <br /> gallons ❑Yes ❑ No <br /> UPCF hwfwrc-b(1/99)-1/4 httpJ/www.unklecs.org Rev.02/16M <br />