Laserfiche WebLink
` TTNTI+, ,n PRO(-R AM C0N.g0T.T"ATF.iI-FORM "O `,� 9 <br /> TANKS �� <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> Pae of <br /> VI.PIPING CONSTRUCTION(Check all that a ly) ABOVEGROUND PIPING <br /> UNDERGROUND PIPING a59. <br /> SYSTEM TYPE i.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458. ❑1.PRESSURE ❑2.SUCTION ❑3.GRAVITY WN a6z. <br /> CONSTRUCTION/ ❑1.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460. ❑1.SINGLE WALL ❑9999.O5. THER <br /> MANUFACTURER ❑2.DOUBLE WALL ❑ <br /> I.Z.DOUBLE WALL ❑95.UNKNOWN <br /> 461. MANUFACTURER 463. <br /> MANUFACTURER [36.FRP COMPATIBLE W/100%METHANOL <br /> ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL ❑1.BARE STEEL 7 GALVANIZED STEEL <br /> ❑2.STAINLESS STEEL [17.GALVANIZED STEEL <br /> C12.STAINLESS STEEL ❑ <br /> ❑3.PLASTIC COMPATIBLE WITH CONTENTS [395.UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑❑9.FLEXIBLE(HDPE) <br /> PR99.OTHER <br /> PROTECTION ❑ <br /> 4.FIBERGLASS [18.FLEXIBLE(HDPE) ❑99.OTHER ❑4.FIBERGLASS ❑95.Lti'IG`OWN 465. <br /> 464. [15.STEEL W/COATING <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTIONB shall submitted to the bdY) <br /> VII.PIPING LEAK DETECTION(Check all thatapply)(A descn ion of the monitoring Pro pgOVEGROUND PIPING <br /> UNDERGROUND PIPING a67. <br /> 466. SINGLE WALL PIPING <br /> SINGLE WALL PIPING PRESSURIZED PIPING(Check all that apply): <br /> PRESSURIZED PIPING(Check all that apply): <br /> 3.0 GPH TEST WITH AUTO PUMP ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO P <br /> UMP <br /> 1. ELECTRONIC LINE LEAK DETECTOR <br /> AND SYSTEM DISCONNECTION S`ANUfD BE AND VISUAL AL TEM F ALARMS. <br /> AND SYSTEM DISCONNECTION <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE, <br /> +AUDIBLE AND VISUAL ALARMS. ❑2. MONTHLY 0.2 GPH TEST <br /> ❑2. MONTHLY 0.2 GPH TEST <br /> ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> �3. ANNUAL INTEGRITY TEST(O.l GPH) [14. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> CONVENTIONAL SUCTION SYSTEMS <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING [15. DAILY VISUAL MONITORING OF PIPING AN'D PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> [17. SELF MONITORING <br /> [17. SELF MONITORING <br /> GRAVITY FLOW <br /> GRAVITY FLOW(Check all that apply): <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) ❑g DAILY VISUAL MONITORING <br /> C]9. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING <br /> SECONDARILY CONTAINED PIPING PRESSURIZED PIPING(Check all that apply): <br /> PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS <br /> AND(Check one)SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> . AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b T OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION <br /> DISCONNECTION <br /> [1c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUT OFF <br /> 11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SOk HUT ❑11. AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION ❑12, ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) SUCTION/GRAVITY SYSTEM <br /> SUCTION/GRAVITY SYSTEM <br /> l3.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS EMERGENCY GENERATORS ONLY(Check all that apply) <br /> EMERGENCY GENERATORS ONLY(Check all that apply) <br /> []14. CONTINUOUS SUMP SENSOR WIT AUTO PUMP SHUT OFF ❑14.AUDIBLE LO�S�UA VISUAL <br /> AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS <br /> ❑15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW ❑15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑17.DAILY VISUAL CHECK <br /> ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> 4. DAILY VISUAL CHECK 469. <br /> DISPENSER CONTAINMENT 468. ❑1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE <br /> DATE INSTALLED [32. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS C]5. TRENCH/LINER MONITORING <br /> ' 3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑6. NONE <br /> C DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. 470. <br /> SIGNA R , -OWNER/OPERATOR DATE: � - <br /> 472. <br /> TITLE OF OWNER/OPERATOR: <br /> NAME OF OWNER/OPE ATOR print): p � <br /> 473. 1 Permit Approved By(Agency use only) <br /> 474. 1 Permit Expiration Date(Agency use only) 475 <br /> Permit Number(Agency use only) . <br /> UPCF hwfwrc-b(1/99)-3/4 http://www.unidocs.org <br /> Rev.02/16/00 <br />