Laserfiche WebLink
Page of <br /> SWRCB,January 2002 <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps ❑ *See comments <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ *See comments <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Fill Sump# Fill Sump# Fill Sump# Fill Sump# <br /> Sump Diameter: <br /> Sump De the <br /> Height from Tank Top to Top of <br /> Hi hest Pi ing Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testin <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> water and starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> �i <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or Criteria: s <br /> Test Result: <br /> Is there a sensor in the sump? <br /> Does the sensor alarm when <br /> either product or water is <br /> detected? <br /> Was sensormod testing? <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Super 91 Tank has a combination STP Piping Sump/Fill Riser Containment Sump. <br /> *Test data for this combination STP Piping Sump/Fill Riser Containment Sump is recorded on Page#4 of this report. <br />