Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard Professional Engineer <br /> I 'Other(Spec) <br /> Test Method Used: X Pressure Vacuum Hydrostatic <br /> C Other(Spec) <br /> Test Equipment Used: Pressure Gauges in PsilNitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx.70' Approx.50' <br /> Product Stored: Regular 87 Regular 87 <br /> Method and location of Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 <br /> Wait time between applying 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:20 9:25 <br /> Initial Reading(Ri): 3 Psi 3 Psi <br /> Test End Time. 10:20 10:25 <br /> Final Reading(RF): 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Replaced old Red Icon Secondary Pipe Test Boot on Regular 87 Secondary Pipe at STP Piping Sump,prior to testing. <br /> Replaced old Blue Line Secondary Pipe Test Boot on Super 91 Secondary Pipe at STP Piping Sump,prior to testing. <br /> rn <br /> JUS' 2 9 ?0;,r <br /> s ! <br />