Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Checkallthatapply)l <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 15r2.FLOAT AND CHAIN ASSEMBLY El 3.ELECTRONIC STAND-ALONE 490-54& <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b, <br /> LEAK MONITOR MANUFACTURER: 490-55. MODEL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 490-57. MODEL#(S):_ 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. [I a.YES &b.No 490-19. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [I a.YES 5.b.No 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN, 0 a.YES [9 b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES [:1 b.NO 490-62 <br /> UDC CONSTRUCTION IS: 1. <br /> SINGLE WALL El 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64& <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES [] b.No 490-64b <br /> VIL PERIODIC SYSTEM TESTING <br /> M 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123 CCR§2644.11 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> a.ALARM LOGS El b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69& <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-696. <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-690. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND 490-69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-699. <br /> El OTHER(Specify): 490-69h.490-691. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70 <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> > Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> to ditional comments here or indicate hgw cr pages with add't' H t.on on s ificmonitoring procedures are attached to this plan. Ce it p <br /> rz�P/& I - <br /> 7 fflte!f�/Yomw Aufc.4 LP:�4'Zip'CIL gc-, ,#r 9.T° ntu <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> byLhisplanoccurs;q)all conditions that indicate ap ible!q!qk qves�atpd, 3) 1 <br /> w� sq_Kej _alljmonitoring records are maintained properly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: <br /> 490-72 TITLE:dA),VEPI,-JAtPirV*(; IEIA- 490-73. <br /> 490-74. TITLE: 490-75. <br /> NAME: 4&Aj 0 IV s -z, "14 <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the informatiogjW-9yi eherein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77, <br /> t <br /> REPRESENTING:0 1.Tank <br /> APP NT T+AMF,'print). 201 490-78. APPLICANT TITLE/ 490-7 <br /> 9. <br /> /6cz <br /> 0 A61a <br /> 4W <br /> UPCF UST-D(12/2007)-3/4 WWW.unidocs.org <br />