My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1856
>
2300 - Underground Storage Tank Program
>
PR0231069
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 11:45:51 AM
Creation date
6/3/2020 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231069
PE
2361
FACILITY_ID
FA0001909
FACILITY_NAME
STOP N SHOP
STREET_NUMBER
1856
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
123-191-02
CURRENT_STATUS
01
SITE_LOCATION
1856 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231069_1856 W COUNTRY CLUB_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar, 25 13 10:53a Reliable PetroleumA 209-845-8953 p.4 <br />Monitoring Sysftin Ce <br />cation <br />F. In -Tank Gsa <br />t SIR Equipment: 0 Cheek this boat if tanky <br />grauging is used o:rl inventory <br />This section must be <br />canttnB. <br />® Check this box if 00 tank gauging or SIR equ went is installed. <br />Ompleted if in -tank equipment is <br />Complete <br />,gauging used to peaforrn leak detection onitoring. <br />the fobowing <br />becklist: <br />i0 Yes <br />I input wiring been inspected for proper entry+and termination, including testing for faults? <br />❑ Yes <br />and <br />all tank gauging probes visually inspected for damage and residue buildup? <br />[No* <br />Q Y� <br />T"uracyof system product level readings tested? <br />® Yes <br />uracy of system water level r dirgs tested? <br />® Yes 'aall probes reinstalled properly? <br />® Yes <br />all itemns on the equipment marwiiactrurer's maintenance checklist completed? <br />* iu file Section H, bele <br />describe how and when these delicieucies were Ar will be cArrected, <br />G. Line Leak Detect <br />Mrs (LLD): p Check this box if LLDs arenot installed. <br />time followin cNo* <br />rcromte <br />For <br />X/A (Ch <br />ut start-up or annual equipment certification, was a leak simu�d to vrify LLD performance?' <br />aftthat —ni-I Simulated leak rate., 0 3 <br />® Na* We <br />g p.h.; ❑ 0.l g.F,h; O 0.2 g.p.h. <br />ail LLDs coni"imrred operational and accurate <br />❑ No* Was <br />within re Mato an <br />testiin g � Te9uiremcnts. <br />g 'amus properly c�iz'brated? <br />0 No*For <br />chanical LLDs, does the LLD restrict product flaw if it detects a leak? <br />F.OYe6 <br />0 NIA <br />Q No* For <br />i is LLDs, does the turbine automatically shut off if the LLD detects Ieaic? <br />19 N/A <br />a <br />0 Yes 0 No* Fore cim+onic LLDs, does the turbine autmatica.11y shut off if any portion of the monitori system is disabled <br />0 NIA or dis onnected? <br />D Yes 0 No* For ectronic LLDs, does the turbine, automatically shut off if an 0 NIA malfu ctions or fails a test? y portion of the monitoring system <br />Cl Yes p No* For el icxronic LLDs_ have all accessible wiring connections been visually inspected? <br />® N!A <br />® Yes C1 No* Were 1 items on the equipment mamrfaeturcr's maintenance checklist completed? <br />* in the Section .K, l bw, <br />lescribe how and wben these d-eficlencks, were or wgl be corrected. <br />H. CamnnenLs. 91 ML <br />I <br />LD failed the 3.t1 GPH @ 14 p5t test. Needs to be replaced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.