Laserfiche WebLink
gOURCt3 � <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> •C1t IIOR M�� <br /> COMPLETE A SEPARATE FORM FORE CH TANK SYSTEM. <br /> MARK ONLY O 1 NEW PERMIT a 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION 7 PERMANENTLY CLOSED SITE <br /> ONE ITEM � 2 INTERIM PERMIT 4 AMENDED PERMIT a 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ✓ Z, <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLONS: �J <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A1 MOTOR VEHICLE FUEL 4 OIL B. C Q eta REGULAR UNLEADED Q 3 DIESEL ED 6 AVIATION GAS <br /> 2 PETROLEUM 80 EMPTY EZ 1 PRODUCT 1b PREMIUM UNLEADED a 4 GASAHOL ED 7 METHANOL <br /> O is MIDGRADE UNLEADED ED 5 JETFUEL ED 8 M85 <br /> a 3 CHEMICAL PRODUCT a 95 UNKNOWN 2 WASTE O 2 LEADED ED 99 OTHER(DESCRIBE IN ITEM D.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF F--j 1 DOUBLE WALL F--� 3 SINGLE WALL WITH EXTERIOR LINER 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 0 2 SINGLE WALL F1 4 SINGLE WALL IN A VAULT 99 OTHER <br /> B. TANK F7 1 BARE STEEL 0 2 STAINLESS STEEL a 3 FIBERGLASS [D 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL F--] 5 CONCRETE EJ 6 POLYVINYL CHLORIDE 0 7 ALUMINUM a 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) � 9 BRONZE 10 GALVANIZED STEEL � 95 UNKN N a 99 OTHER <br /> C.INTERIOR F] 1 RUBBER LINED 2 ALKYD LINING 3 E XY LINING 0 4 PHENOLIC LINING <br /> LINING OR 5 GLASS LINING ❑ 6 UNLINED F-1UNKNOWN 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR 1 POLYETHYLENE WRAP F-] 2 COATING 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION Ej 5 CATHODIC PROTECTION E:] 91 NONE 95 UNKNOWN 0 99 OTHER <br /> E.SPILL AND OVERFILL,CIC. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO FAKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOV@'GR416N R U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A RESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A 2- DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED EEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 MECHANICAL UNE O 2 UNE TIGHTNESS ED 3 CONTINUOUS INTERSTITIAL ❑4 ELECTRONIC LINE ❑5 AUTOMATIC PUMP ❑ 99 OTHER <br /> DETECTOR TESTING MONITORING LEAK DETECTOR SHUTDOWN <br /> V.TANK LEAK DETECTION <br /> 1 VISUAL CHECK 2 MANUAL RECONCILIATION MONITORING <br /> TANK <br /> 3 MONITORING a 4 GAUGING IC TANK 5 MONITORING TER 6 TESTING <br /> E] 7 MONITOR CONTINUOUS a 8 SIR a 9 WEEK LY MANUAL 10 MO TINLY TANK 95 UNKNOWN 99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES 0 NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED 8 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D:# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLIC ON-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE&GROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />