My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. REQUIRED INSPECTIONS <br /> Note: The contractor's PHS-EHD approved plans of the UST installation shall be retained at the <br /> job site and must be shown to the PHS-EHD inspector upon request. In addition, the <br /> applicable fire department shall approve the UST installation prior to commencement of <br /> work. _ <br /> All appointments for inspections must be made at least 48 hours in advance. Below are the <br /> minimum required inspections: <br /> a. Before installation, the tank shall be tested for tightness at the installation site in accordance <br /> with the manufacturer's written guidelines. If there are no guidelines, the primary and <br /> secondary containment shall be tested for tightness with air pressure between 3 and 5 pounds <br /> per square inch. In lieu of a pressure test, a vacuum expressed in inches of mercury in the <br /> interstitial space of the secondary containment, is acceptable. The pressure (or vacuum in <br /> the interstitial space) shall be maintained for a minimum of 30 minutes. <br /> b. All new primary piping and secondary containment systems shall be tested for tightness after <br /> installation in accordance with manufacturer's guidelines. Primary-pressurized piping*shall <br /> be hydrostatically tested at 150 percent of design operating pressure or pneumatically at 110 <br /> percent of design operating pressure. If the calculated test pressure for pressurized piping is <br /> less than 40 psi, 40 psi shall be used as the test pressure. The pressure shall be maintained <br /> for a minimum of 30 minutes and all joints shall be soap tested. If there are no <br /> manufacturer's guidelines, secondary containment systems shall be tested using an applicable <br /> method specified in an industry code or engineering standard. <br /> C. All lines other than pressure piping shall be pressure tested at not less than 3 p.s.i. and not <br /> more than 5 p.s.i. for a minimum of 30 minutes and soap tested while under pressure. <br /> d. Containment sumps shall pass a 24 hour hydrostatic leak test. <br /> e. The spill container shall be shown to be capable of draining liquid back into the fuel tanks. <br /> f The monitoring system shall pass a functional test. The functional test shall consist of the <br /> activation of the alarm via all monitoring probes/sensors. <br /> g. Final inspection and approval to operate will be granted after the above requirements are <br /> satisfied and a hard copy of the tank integrity test (as required by Section 2635 (a) (5)] is <br /> submitted to the inspector at the site. <br /> If you need further assistance, or wish to schedule an appointment to discuss the plan review <br /> or field inspection, please contact our Underground Storage Tank.Staff at (209)=468-3427. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.