Laserfiche WebLink
1G/V%/vi lnu V r :41 ran ato 4a, urto rim Ugle6 "nsuiTing 10 006 <br /> 09-.'22/97 10:00 x°714 739 �S BRAVO SYSTFXS �0O9 <br /> ASG. <br /> Pecialists in <br /> :oiltaitii'i ent Syms, <br /> SUM EM N=200 <br /> ffectIve, iMedi.ately all our B-Zoo <br /> ontainment boxes will be <br /> anufactured crit$ an. extension on <br /> ach corner of the box. This new <br /> oncept will reduce Chipping and or l <br /> racking of the island concrete / - <br /> aused by anchor bolts. <br /> ROCEDUIES M <br /> ew st at' <br /> hen the contractor preforms the box <br /> r=e, the B--200 Can be secured <br /> mderneath of the island slab. <br /> rill a 1/28 hole in each leg (see <br /> igure #i). <br /> 1. .er saw cutting the island to A <br /> ccept the B-200 by allowing :" ----_ <br /> olerance of 1/28 to 3/4w --- <br /> dimensions A & B) Drill a 1/28 _--' <br /> Ole in each leg (see Figure #1), <br /> at a length of angle or flat steel B B <br /> o <br /> desired length depending an the ' <br /> oncrete island thickness (see <br /> igure #2).. Drill 3/28 • hol*- to <br /> etch Mole in box extensions and . <br /> ttach. +Cut a length of angle <br /> 9er ttum aBf. +aimeats3on (see <br /> Lgure <br /> M-4m•ill angle .#3 to meet center oZ-_ - <br /> 0- =ion -#2. Placm an a #3 t 1'�+0�t ;..f r.►.. d .Y • <br /> Lose to the bottcm of the island.8S• '•.'��"�=• '� � �+. .• � �•+�' � ,j- <br /> :15sible. Mark hole location oda leg � _ ' ;`:'f '-,'•.` ��� '+'�a� <br /> ft=sions #2 and drill, and bolt #2 <br /> zd #3. _ - <br /> addit3.onal saugnesss is required - - <br /> -adges can be tapped in place at the g <br /> Ids Of angles ,#3 (see Figures 4 and <br /> tC4A <br /> ..si®S IGDEC92 - <br />